{
  "_source": "https://blackstart.c3ksolutions.com/api",
  "_license": "https://blackstart.c3ksolutions.com/license",
  "_disclaimer": "BLACKSTART data is published for evaluation, internal analysis, and editorial citation with attribution. Verify against the primary source (AESO Long-term Adequacy report, AUC Current Applications, AB/BC MPI registry, county permit notices, gov news feeds) before making procurement, financing, or regulatory decisions. Use at your own risk.",
  "_attribution_required": "Any public reuse must credit \"BLACKSTART (a C3K Solutions product, https://blackstart.c3ksolutions.com)\" with a working link.",
  "_terms_short": "Free for evaluation + internal analysis + editorial citation. Commercial redistribution / republication as-a-product requires written permission. Contact: hello@c3ksolutions.com.",
  "generated_at": "2026-05-11T14:50:01+00:00",
  "summary": {
    "projects_tracked": 55,
    "aeso_allocations_tracked": 196,
    "total_dts_mw_in_queue": 21971,
    "phase1_mw_active": 3183,
    "filings_dc": 12,
    "news_dc": 4,
    "total_capex_millions": 47510,
    "provinces": [
      "AB",
      "BC",
      "SK"
    ]
  },
  "phase1_winners": [
    {
      "proj_no": "P2936",
      "name": "GLDC Load Phase 1.1",
      "mw": 970,
      "in_service_date": "2027-05-01",
      "fuel_type": "No Supply",
      "planning_region": "33-Fort Saskatchewan",
      "cluster": "Non-Cluster",
      "linked_project": "Greenlight Electricity Centre",
      "linked_proponent": "Pembina Pipeline and Kineticor JV"
    },
    {
      "proj_no": "SP-BELL-001",
      "name": "Bell Sherwood AI Data Centre",
      "mw": 300,
      "in_service_date": "2026-12-31",
      "fuel_type": "SaskPower grid + SaskEnergy gas",
      "planning_region": "Regina Area",
      "cluster": "Bell AI Sherwood",
      "linked_project": "Bell — RM of Sherwood AI Data Centre",
      "linked_proponent": "Bell Canada / Government of Saskatchewan"
    },
    {
      "proj_no": "P3083",
      "name": "Keephills Data Centre Phase 1.1",
      "mw": 230,
      "in_service_date": "2027-01-01",
      "fuel_type": "No Supply",
      "planning_region": "40-Wabamun",
      "cluster": "Non-Cluster",
      "linked_project": "TransAlta Keephills Data Centre",
      "linked_proponent": "TransAlta + CPP Investments + Brookfield"
    },
    {
      "proj_no": "P3034",
      "name": "Valley Edge Battery",
      "mw": 200,
      "in_service_date": "2028-10-01",
      "fuel_type": "Storage",
      "planning_region": "35-Red Deer",
      "cluster": "CNTL-02",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P2845",
      "name": "Marguerite Lake CAE Storage",
      "mw": 125,
      "in_service_date": "2028-03-31",
      "fuel_type": "Storage",
      "planning_region": "28-Cold Lake",
      "cluster": "CNTL-01",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P3046",
      "name": "Marguerite Lake Compressed Air Phase 2",
      "mw": 125,
      "in_service_date": "2027-12-22",
      "fuel_type": "Storage",
      "planning_region": "28-Cold Lake",
      "cluster": "CNTL-02",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P2789",
      "name": "Red Willow Solar Battery",
      "mw": 100,
      "in_service_date": "2028-08-31",
      "fuel_type": "Solar",
      "planning_region": "36-Alliance/Battle River",
      "cluster": "CNTL-01",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P3079",
      "name": "Captus Load",
      "mw": 74,
      "in_service_date": "2027-09-01",
      "fuel_type": "No Supply",
      "planning_region": "55-Glenwood",
      "cluster": "Non-Cluster",
      "linked_project": "Gryphon Digital Alberta AI and Data Center",
      "linked_proponent": "Gryphon Digital Mining"
    },
    {
      "proj_no": "P3157",
      "name": "Clearwater Technology Park Data Load",
      "mw": 74,
      "in_service_date": "2027-10-01",
      "fuel_type": "No Supply",
      "planning_region": "06-Calgary",
      "cluster": "Non-Cluster",
      "linked_project": "Clearwater Technology Park",
      "linked_proponent": "Undisclosed"
    },
    {
      "proj_no": "P3174",
      "name": "Sovereign Cloud Data Load",
      "mw": 74,
      "in_service_date": "2029-12-31",
      "fuel_type": "No Supply",
      "planning_region": "60-Edmonton",
      "cluster": "Non-Cluster",
      "linked_project": "Sovereign Cloud Data Centre",
      "linked_proponent": "Undisclosed"
    },
    {
      "proj_no": "P2952",
      "name": "North Calgary One Data Centre MPC Load",
      "mw": 74,
      "in_service_date": "2027-03-26",
      "fuel_type": "No Supply",
      "planning_region": "06-Calgary",
      "cluster": "Non-Cluster",
      "linked_project": "North Calgary One Data Centre",
      "linked_proponent": "Undisclosed"
    },
    {
      "proj_no": "P2953",
      "name": "North Calgary Two Data Centre MPC Load",
      "mw": 74,
      "in_service_date": "2027-03-26",
      "fuel_type": "No Supply",
      "planning_region": "06-Calgary",
      "cluster": "Non-Cluster",
      "linked_project": "North Calgary Two Data Centre",
      "linked_proponent": "Undisclosed"
    },
    {
      "proj_no": "P3126",
      "name": "Sollair Load",
      "mw": 74,
      "in_service_date": "2027-12-10",
      "fuel_type": "No Supply",
      "planning_region": "57-Airdrie",
      "cluster": "Non-Cluster",
      "linked_project": "Sollair Data Centre",
      "linked_proponent": "Undisclosed"
    },
    {
      "proj_no": "P3014",
      "name": "Meadowview Solar Battery",
      "mw": 66,
      "in_service_date": "2027-12-20",
      "fuel_type": "Solar",
      "planning_region": "60-Edmonton",
      "cluster": "EDM-02",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P3015",
      "name": "Spruce Grove North Solar Battery",
      "mw": 66,
      "in_service_date": "2027-12-20",
      "fuel_type": "Solar",
      "planning_region": "60-Edmonton",
      "cluster": "EDM-02",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P3065",
      "name": "UK LS2 & LS6 Solar Battery",
      "mw": 51,
      "in_service_date": "2028-07-01",
      "fuel_type": "Solar",
      "planning_region": "23-Valleyview",
      "cluster": "NW-02",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P2453",
      "name": "EDTI Edmonton 3 H2 Plant Cogen",
      "mw": 50,
      "in_service_date": "2026-06-01",
      "fuel_type": "Gas",
      "planning_region": "60-Edmonton",
      "cluster": "Non-Cluster",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P2517",
      "name": "Hutchison MPC Battery",
      "mw": 50,
      "in_service_date": "2029-11-22",
      "fuel_type": "Storage",
      "planning_region": "04-Medicine Hat",
      "cluster": "Non-Cluster",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P2707",
      "name": "Sounding Creek Solar Battery",
      "mw": 50,
      "in_service_date": "2028-05-01",
      "fuel_type": "Solar",
      "planning_region": "42-Hanna",
      "cluster": "CNTL-01",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P2520",
      "name": "Laramide MPC Battery",
      "mw": 50,
      "in_service_date": "2027-10-15",
      "fuel_type": "Storage",
      "planning_region": "46-High River",
      "cluster": "Non-Cluster",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P3075",
      "name": "Balzac Area Load",
      "mw": 45,
      "in_service_date": "2026-12-01",
      "fuel_type": "No Supply",
      "planning_region": "06-Calgary",
      "cluster": "Non-Cluster",
      "linked_project": "Balzac Area Data Centre",
      "linked_proponent": "Undisclosed"
    },
    {
      "proj_no": "P2967",
      "name": "Clearwater Facility Cogen",
      "mw": 35,
      "in_service_date": "2029-07-01",
      "fuel_type": "Gas",
      "planning_region": "39-Didsbury",
      "cluster": "CNTL-02",
      "linked_project": "Clearwater Technology Park",
      "linked_proponent": "Undisclosed"
    },
    {
      "proj_no": "P3039",
      "name": "Evolve Battery",
      "mw": 25,
      "in_service_date": "2026-10-01",
      "fuel_type": "Storage",
      "planning_region": "26-Swan Hills",
      "cluster": "NW-02",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P2975",
      "name": "Genesee MPC Gas",
      "mw": 24,
      "in_service_date": "2029-03-01",
      "fuel_type": "Gas",
      "planning_region": "40-Wabamun",
      "cluster": "EDM-02",
      "linked_project": "Capital Power Polaris @ Genesee Energy Campus",
      "linked_proponent": "Capital Power (data centre developer unnamed)"
    },
    {
      "proj_no": "P2533",
      "name": "Greenlight Gas",
      "mw": 20,
      "in_service_date": "2028-06-01",
      "fuel_type": "Gas",
      "planning_region": "33-Fort Saskatchewan",
      "cluster": "Non-Cluster",
      "linked_project": "Greenlight Electricity Centre",
      "linked_proponent": "Pembina Pipeline and Kineticor JV"
    },
    {
      "proj_no": "P2796",
      "name": "Greenlight U2 Gas",
      "mw": 20,
      "in_service_date": "2028-06-01",
      "fuel_type": "Gas",
      "planning_region": "33-Fort Saskatchewan",
      "cluster": "NE-01",
      "linked_project": "Greenlight Electricity Centre",
      "linked_proponent": "Pembina Pipeline and Kineticor JV"
    },
    {
      "proj_no": "P2797",
      "name": "Greenlight U3 Gas",
      "mw": 20,
      "in_service_date": "2028-06-01",
      "fuel_type": "Gas",
      "planning_region": "33-Fort Saskatchewan",
      "cluster": "NE-01",
      "linked_project": "Greenlight Electricity Centre",
      "linked_proponent": "Pembina Pipeline and Kineticor JV"
    },
    {
      "proj_no": "P3006",
      "name": "Clairmont Energy Gas",
      "mw": 20,
      "in_service_date": "2029-05-01",
      "fuel_type": "Gas",
      "planning_region": "20-Grande Prairie",
      "cluster": "NW-02",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P2941",
      "name": "WFS Cogen",
      "mw": 15,
      "in_service_date": "2028-01-15",
      "fuel_type": "Gas",
      "planning_region": "33-Fort Saskatchewan",
      "cluster": "NE-02",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P3040",
      "name": "AHI Prairie Eagle MPC Cogen",
      "mw": 10,
      "in_service_date": "2027-01-01",
      "fuel_type": "Gas",
      "planning_region": "35-Red Deer",
      "cluster": "CNTL-02",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P2983",
      "name": "Moraine MPC Gas",
      "mw": 7,
      "in_service_date": "2028-02-01",
      "fuel_type": "Gas",
      "planning_region": "26-Swan Hills",
      "cluster": "NW-02",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P2843",
      "name": "Prairie Lights Power Gas",
      "mw": 5,
      "in_service_date": "2028-06-01",
      "fuel_type": "Gas",
      "planning_region": "20-Grande Prairie",
      "cluster": "NW-01",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P2411",
      "name": "Northland Power Jurassic MPC Solar Battery",
      "mw": 3,
      "in_service_date": "2026-03-09",
      "fuel_type": "Solar",
      "planning_region": "48-Empress",
      "cluster": "Non-Cluster",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P2034",
      "name": "Cold Lake Energy (Lindbergh Cogeneration)",
      "mw": 3,
      "in_service_date": "2029-08-01",
      "fuel_type": "Gas",
      "planning_region": "28-Cold Lake",
      "cluster": "Non-Cluster",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P2602",
      "name": "Collisard MPC Gas",
      "mw": 3,
      "in_service_date": "2029-01-31",
      "fuel_type": "Gas",
      "planning_region": "35-Red Deer",
      "cluster": "Non-Cluster",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P2656",
      "name": "Edmonton CCUS Gas",
      "mw": 3,
      "in_service_date": "2029-03-31",
      "fuel_type": "Gas",
      "planning_region": "60-Edmonton",
      "cluster": "Non-Cluster",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P2454",
      "name": "Flipi MPC Gas",
      "mw": 2,
      "in_service_date": "2029-08-31",
      "fuel_type": "Gas",
      "planning_region": "30-Drayton Valley",
      "cluster": "Non-Cluster",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P2464",
      "name": "Sunnynook Solar Battery",
      "mw": 2,
      "in_service_date": "2027-05-01",
      "fuel_type": "Solar",
      "planning_region": "43-Sheerness",
      "cluster": "Non-Cluster",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P2467",
      "name": "Pteragen Peace Butte Wind",
      "mw": 2,
      "in_service_date": "2028-05-01",
      "fuel_type": "Wind",
      "planning_region": "04-Medicine Hat",
      "cluster": "Non-Cluster",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P2619",
      "name": "Sweetgrass MPC Solar Battery",
      "mw": 2,
      "in_service_date": "2028-06-01",
      "fuel_type": "Solar",
      "planning_region": "53-Fort Macleod",
      "cluster": "Non-Cluster",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P2728",
      "name": "Kersey Solar",
      "mw": 2,
      "in_service_date": "2027-06-01",
      "fuel_type": "Solar",
      "planning_region": "57-Airdrie",
      "cluster": "CNTL-01",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P2806",
      "name": "Piikani Wind",
      "mw": 2,
      "in_service_date": "2028-02-28",
      "fuel_type": "Wind",
      "planning_region": "53-Fort Macleod",
      "cluster": "SW-CAL-01",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P3001",
      "name": "Midnight MPC Battery",
      "mw": 2,
      "in_service_date": "2029-10-18",
      "fuel_type": "Storage",
      "planning_region": "04-Medicine Hat",
      "cluster": "SE-02",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P2552",
      "name": "Lone Butte Solar",
      "mw": 2,
      "in_service_date": "2027-11-01",
      "fuel_type": "Solar",
      "planning_region": "39-Didsbury",
      "cluster": "Non-Cluster",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P2418",
      "name": "Greencells Estuary Solar",
      "mw": 1,
      "in_service_date": "2028-01-31",
      "fuel_type": "Solar",
      "planning_region": "48-Empress",
      "cluster": "Non-Cluster",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P2445",
      "name": "Homestead MPC Solar",
      "mw": 1,
      "in_service_date": "2027-03-01",
      "fuel_type": "Solar",
      "planning_region": "53-Fort Macleod",
      "cluster": "Non-Cluster",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P2503",
      "name": "Willow Ridge Wind Battery",
      "mw": 1,
      "in_service_date": "2027-09-01",
      "fuel_type": "Wind",
      "planning_region": "53-Fort Macleod",
      "cluster": "Non-Cluster",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P2460",
      "name": "ABO Fox Meadows Wind",
      "mw": 1,
      "in_service_date": "2028-09-01",
      "fuel_type": "Wind",
      "planning_region": "37-Provost",
      "cluster": "Non-Cluster",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P2461",
      "name": "Aira Solar",
      "mw": 1,
      "in_service_date": "2027-12-15",
      "fuel_type": "Solar",
      "planning_region": "04-Medicine Hat",
      "cluster": "Non-Cluster",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P2091",
      "name": "Arenosum Solar",
      "mw": 1,
      "in_service_date": "2028-05-26",
      "fuel_type": "Solar",
      "planning_region": "48-Empress",
      "cluster": "Non-Cluster",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P2356",
      "name": "Oyen Wind",
      "mw": 1,
      "in_service_date": "2027-09-01",
      "fuel_type": "Wind",
      "planning_region": "42-Hanna",
      "cluster": "Non-Cluster",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P2378",
      "name": "RESC Nova MPC Solar",
      "mw": 1,
      "in_service_date": "2027-08-01",
      "fuel_type": "Solar",
      "planning_region": "45-Strathmore/Blackie",
      "cluster": "Non-Cluster",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P2396",
      "name": "Georgetown Solar",
      "mw": 1,
      "in_service_date": "2026-11-16",
      "fuel_type": "Solar",
      "planning_region": "45-Strathmore/Blackie",
      "cluster": "Non-Cluster",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P2451",
      "name": "Georgetown Battery Addition",
      "mw": 1,
      "in_service_date": "2027-04-21",
      "fuel_type": "Storage",
      "planning_region": "45-Strathmore/Blackie",
      "cluster": "Non-Cluster",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P2592",
      "name": "Big Rock Solar Battery",
      "mw": 1,
      "in_service_date": "2028-06-30",
      "fuel_type": "Solar",
      "planning_region": "46-High River",
      "cluster": "Non-Cluster",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P2611",
      "name": "UK Solar East",
      "mw": 1,
      "in_service_date": "2028-08-01",
      "fuel_type": "Solar",
      "planning_region": "42-Hanna",
      "cluster": "Non-Cluster",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P2747",
      "name": "Vegreville 709S DER Battery",
      "mw": 1,
      "in_service_date": "2027-03-01",
      "fuel_type": "Storage",
      "planning_region": "56-Vegreville",
      "cluster": "CNTL-01",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P2540",
      "name": "Rising Sun Solar",
      "mw": 1,
      "in_service_date": "2027-03-30",
      "fuel_type": "Solar",
      "planning_region": "37-Provost",
      "cluster": "Non-Cluster",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P2616",
      "name": "Jumbo Battery",
      "mw": 1,
      "in_service_date": "2028-04-01",
      "fuel_type": "Storage",
      "planning_region": "53-Fort Macleod",
      "cluster": "Non-Cluster",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P2713",
      "name": "Little Smoky 1 Solar",
      "mw": 1,
      "in_service_date": "2028-07-15",
      "fuel_type": "Solar",
      "planning_region": "23-Valleyview",
      "cluster": "NW-01",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P2738",
      "name": "Little Smoky 4 Solar",
      "mw": 1,
      "in_service_date": "2028-02-15",
      "fuel_type": "Solar",
      "planning_region": "23-Valleyview",
      "cluster": "NW-01",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P2758",
      "name": "UK Solar West",
      "mw": 1,
      "in_service_date": "2028-08-31",
      "fuel_type": "Solar",
      "planning_region": "42-Hanna",
      "cluster": "CNTL-01",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P3029",
      "name": "Irrican Chin Battery",
      "mw": 1,
      "in_service_date": "2028-02-25",
      "fuel_type": "Storage",
      "planning_region": "54-Lethbridge",
      "cluster": "SE-02",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P2553",
      "name": "Dolcy MPC Solar and Storage",
      "mw": 1,
      "in_service_date": "2029-12-01",
      "fuel_type": "Solar",
      "planning_region": "37-Provost",
      "cluster": "Non-Cluster",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P2566",
      "name": "Eastervale Solar",
      "mw": 1,
      "in_service_date": "2027-10-01",
      "fuel_type": "Solar",
      "planning_region": "37-Provost",
      "cluster": "Non-Cluster",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P2774",
      "name": "Castor North Solar Battery",
      "mw": 0,
      "in_service_date": "2027-12-01",
      "fuel_type": "Solar",
      "planning_region": "42-Hanna",
      "cluster": "CNTL-01",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P3099",
      "name": "Sollair BESS",
      "mw": 0,
      "in_service_date": "2027-12-10",
      "fuel_type": "Storage",
      "planning_region": "57-Airdrie",
      "cluster": "Non-Cluster",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P2337",
      "name": "Dunmore Solar",
      "mw": 0,
      "in_service_date": "2028-03-31",
      "fuel_type": "Solar",
      "planning_region": "04-Medicine Hat",
      "cluster": "Non-Cluster",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P1828",
      "name": "hep Energy Alderson MPC Solar",
      "mw": 0,
      "in_service_date": "2025-04-10",
      "fuel_type": "Solar",
      "planning_region": "04-Medicine Hat",
      "cluster": "Non-Cluster",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P2488",
      "name": "Kâpîsimotêt Solar",
      "mw": 0,
      "in_service_date": "2028-01-12",
      "fuel_type": "Solar",
      "planning_region": "31-Wetaskiwin",
      "cluster": "Non-Cluster",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P2456",
      "name": "Opal Gas",
      "mw": 0,
      "in_service_date": "2027-07-30",
      "fuel_type": "Gas",
      "planning_region": "24-Fox Creek",
      "cluster": "Non-Cluster",
      "linked_project": "Opal Data Centre",
      "linked_proponent": "Undisclosed"
    },
    {
      "proj_no": "P2334",
      "name": "TCE Saddlebrook Solar Storage",
      "mw": 0,
      "in_service_date": "2023-10-25",
      "fuel_type": "Solar",
      "planning_region": "46-High River",
      "cluster": "Non-Cluster",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P3141",
      "name": "Opal Data Load",
      "mw": 0,
      "in_service_date": "2027-02-11",
      "fuel_type": "No Supply",
      "planning_region": "24-Fox Creek",
      "cluster": "Non-Cluster",
      "linked_project": "Opal Data Centre",
      "linked_proponent": "Undisclosed"
    },
    {
      "proj_no": "P2879",
      "name": "Hayter 277S DER Gas",
      "mw": 0,
      "in_service_date": "2027-12-10",
      "fuel_type": "Gas",
      "planning_region": "37-Provost",
      "cluster": "Non-Cluster",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P2881",
      "name": "South Mayerthorpe 443S DER Gas",
      "mw": 0,
      "in_service_date": "2028-05-10",
      "fuel_type": "Gas",
      "planning_region": "40-Wabamun",
      "cluster": "Non-Cluster",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P3160",
      "name": "Kearl Oil Sands Mine Cogen",
      "mw": 0,
      "in_service_date": "2029-06-29",
      "fuel_type": "Gas",
      "planning_region": "25-Fort McMurray",
      "cluster": "Non-Cluster",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P2457",
      "name": "Fortis Moon Lake DER Solar",
      "mw": 0,
      "in_service_date": "2026-09-04",
      "fuel_type": "Solar",
      "planning_region": "30-Drayton Valley",
      "cluster": "Non-Cluster",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P2462",
      "name": "Fortis Stony Plain 434S DER Solar",
      "mw": 0,
      "in_service_date": "2026-09-04",
      "fuel_type": "Solar",
      "planning_region": "40-Wabamun",
      "cluster": "Non-Cluster",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P2465",
      "name": "Enerfin Winnifred Wind + Solar Modification",
      "mw": 0,
      "in_service_date": "2024-11-27",
      "fuel_type": "Wind",
      "planning_region": "04-Medicine Hat",
      "cluster": "Non-Cluster",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P2471",
      "name": "Fortis Buford 538S DER Solar",
      "mw": 0,
      "in_service_date": "2026-09-04",
      "fuel_type": "Solar",
      "planning_region": "31-Wetaskiwin",
      "cluster": "Non-Cluster",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P2192",
      "name": "ENMAX FMC Change",
      "mw": 0,
      "in_service_date": "2026-10-04",
      "fuel_type": "Gas",
      "planning_region": "06-Calgary",
      "cluster": "Non-Cluster",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P2195",
      "name": "FortisAlberta Bassano 435S DER Solar",
      "mw": 0,
      "in_service_date": "2024-03-25",
      "fuel_type": "Solar",
      "planning_region": "47-Brooks",
      "cluster": "Non-Cluster",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P2259",
      "name": "FortisAlberta Metiskow 648S DER Solar",
      "mw": 0,
      "in_service_date": "2026-11-30",
      "fuel_type": "Solar",
      "planning_region": "37-Provost",
      "cluster": "Non-Cluster",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P2369",
      "name": "ATCO Anderson 801S DER Solar",
      "mw": 0,
      "in_service_date": "2027-11-03",
      "fuel_type": "Solar",
      "planning_region": "43-Sheerness",
      "cluster": "Non-Cluster",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P2446",
      "name": "Fortis Tilley 498S DER Solar",
      "mw": 0,
      "in_service_date": "2025-11-07",
      "fuel_type": "Solar",
      "planning_region": "47-Brooks",
      "cluster": "Non-Cluster",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P2627",
      "name": "Sundre 575S DER Solar",
      "mw": 0,
      "in_service_date": "2027-11-09",
      "fuel_type": "Solar",
      "planning_region": "38-Caroline",
      "cluster": "Non-Cluster",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P2678",
      "name": "SS-37 DER Gas",
      "mw": 0,
      "in_service_date": "2027-06-01",
      "fuel_type": "Gas",
      "planning_region": "06-Calgary",
      "cluster": "Non-Cluster",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P2805",
      "name": "High River 65S DER Gas",
      "mw": 0,
      "in_service_date": "2026-11-01",
      "fuel_type": "Gas",
      "planning_region": "46-High River",
      "cluster": "SW-CAL-01",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P2924",
      "name": "Three Hills 770S DER Battery",
      "mw": 0,
      "in_service_date": "2027-09-30",
      "fuel_type": "Storage",
      "planning_region": "42-Hanna",
      "cluster": "Non-Cluster",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P2925",
      "name": "Michichi Creek 802S DER Battery",
      "mw": 0,
      "in_service_date": "2027-09-30",
      "fuel_type": "Storage",
      "planning_region": "42-Hanna",
      "cluster": "Non-Cluster",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P3082",
      "name": "Fort Nelson Generating Station Gas",
      "mw": 0,
      "in_service_date": "2026-06-22",
      "fuel_type": "Gas",
      "planning_region": "17-Rainbow Lake",
      "cluster": "Non-Cluster",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P3148",
      "name": "Updike 886S DER Gas",
      "mw": 0,
      "in_service_date": "2027-10-01",
      "fuel_type": "Gas",
      "planning_region": "20-Grande Prairie",
      "cluster": "Non-Cluster",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P2722",
      "name": "Sturgeon 734S DER Solar",
      "mw": 0,
      "in_service_date": "2027-02-15",
      "fuel_type": "Solar",
      "planning_region": "23-Valleyview",
      "cluster": "NW-01",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P2753",
      "name": "Jarrow 252S DER Solar Battery",
      "mw": 0,
      "in_service_date": "2027-11-30",
      "fuel_type": "Solar",
      "planning_region": "32-Wainwright",
      "cluster": "CNTL-01",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P2754",
      "name": "Tucuman 478S DER Solar Battery",
      "mw": 0,
      "in_service_date": "2027-11-30",
      "fuel_type": "Solar",
      "planning_region": "32-Wainwright",
      "cluster": "CNTL-01",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P2757",
      "name": "Sturgeon 734S DER Battery",
      "mw": 0,
      "in_service_date": "2027-07-01",
      "fuel_type": "Storage",
      "planning_region": "23-Valleyview",
      "cluster": "NW-01",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P2751",
      "name": "Hussar 431S Battery",
      "mw": 0,
      "in_service_date": "2027-04-01",
      "fuel_type": "Storage",
      "planning_region": "45-Strathmore/Blackie",
      "cluster": "SW-CAL-01",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P2827",
      "name": "Vilna 777S DER Solar",
      "mw": 0,
      "in_service_date": "2029-08-31",
      "fuel_type": "Solar",
      "planning_region": "56-Vegreville",
      "cluster": "CNTL-01",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P2829",
      "name": "Coronation 773S DER Solar",
      "mw": 0,
      "in_service_date": "2027-02-15",
      "fuel_type": "Solar",
      "planning_region": "42-Hanna",
      "cluster": "CNTL-01",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P2869",
      "name": "Provost 545S DER Gas",
      "mw": 0,
      "in_service_date": "2027-11-05",
      "fuel_type": "Gas",
      "planning_region": "37-Provost",
      "cluster": "Non-Cluster",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P2880",
      "name": "Warner 344S DER Gas",
      "mw": 0,
      "in_service_date": "2028-02-13",
      "fuel_type": "Gas",
      "planning_region": "55-Glenwood",
      "cluster": "Non-Cluster",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P2729",
      "name": "Coaldale 254S DER Solar & Wind",
      "mw": 0,
      "in_service_date": "2028-08-31",
      "fuel_type": "Wind",
      "planning_region": "54-Lethbridge",
      "cluster": "SE-01",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P2944",
      "name": "Mowat 2033S DER Gas",
      "mw": 0,
      "in_service_date": "2027-04-01",
      "fuel_type": "Gas",
      "planning_region": "20-Grande Prairie",
      "cluster": "NW-02",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P3013",
      "name": "Raymond Reservoir Battery",
      "mw": 0,
      "in_service_date": "2028-02-25",
      "fuel_type": "Storage",
      "planning_region": "55-Glenwood",
      "cluster": "SW-CAL-02",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P2997",
      "name": "Three Hills 770S DER Solar",
      "mw": 0,
      "in_service_date": "2027-10-01",
      "fuel_type": "Solar",
      "planning_region": "42-Hanna",
      "cluster": "CNTL-02",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P3026",
      "name": "Pigeon Lake 964S DER Solar",
      "mw": 0,
      "in_service_date": "2026-09-01",
      "fuel_type": "Solar",
      "planning_region": "31-Wetaskiwin",
      "cluster": "EDM-02",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P3031",
      "name": "Oyen Wind Ph 2",
      "mw": 0,
      "in_service_date": "2029-10-15",
      "fuel_type": "Wind",
      "planning_region": "42-Hanna",
      "cluster": "CNTL-02",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P3056",
      "name": "Onoway 352S DER Gas Battery",
      "mw": 0,
      "in_service_date": "2027-09-01",
      "fuel_type": "Gas",
      "planning_region": "40-Wabamun",
      "cluster": "EDM-02",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P3069",
      "name": "Prairie Lights Power Unit 2 MPC Gas",
      "mw": 0,
      "in_service_date": "2029-06-01",
      "fuel_type": "Gas",
      "planning_region": "20-Grande Prairie",
      "cluster": "NW-02",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P2513",
      "name": "Shell Scotford Substation Reliability",
      "mw": 0,
      "in_service_date": "2027-11-25",
      "fuel_type": "Other",
      "planning_region": "33-Fort Saskatchewan",
      "cluster": "Non-Cluster",
      "linked_project": null,
      "linked_proponent": null
    },
    {
      "proj_no": "P2524",
      "name": "Shell SR Scotford Solar",
      "mw": 0,
      "in_service_date": "2024-06-20",
      "fuel_type": "Solar",
      "planning_region": "33-Fort Saskatchewan",
      "cluster": "Non-Cluster",
      "linked_project": null,
      "linked_proponent": null
    }
  ],
  "leaderboard": [
    {
      "id": 1376,
      "source": "AB_MPI",
      "source_id": "11416",
      "name": "eStruxture CAL-3 Data Centre",
      "province": "AB",
      "proponent": "eStruxture",
      "municipality": "Rocky View County",
      "sector": "Industrial",
      "stage": "Under Construction",
      "mw_mpi": null,
      "estimated_cost_millions": 750.0,
      "schedule": "2024 - 2026",
      "registry_url": "https://majorprojects.alberta.caThe project will see the construction of a new data centre in Rocky View County known as CAL-3.�CAL-3 will be a Tier III data centre able to offer rack densities of up to 125 kW across multiple customizable data halls. The facility will also include a 90 MW power generation component. Upon completion, the facility will be the largest data centre in Alberta.� Location on map is not exact.",
      "mw_dc_load": null,
      "mw_btm_gen": null,
      "mw_canonical": null,
      "aeso_total_dts_mw": null,
      "aeso_allocations": [],
      "auc_filings": [],
      "news_signals": [],
      "municipal_permits": [],
      "score": {
        "rank": 1,
        "final": 95.5,
        "confidence": "high",
        "proponent_disclosed": true,
        "_paid_tier_note": "Per-component breakdown + math chain available in paid operator console."
      },
      "gen_set": {
        "applicable": false,
        "reason": "no_load_mw_and_no_thermal_gen",
        "project_class": "colocation"
      }
    },
    {
      "id": 1750,
      "source": "AB_MPI",
      "source_id": "11866",
      "name": "eStruxtue CAL-1 Data Centre - Phase 4 Alterations",
      "province": "AB",
      "proponent": "eStruxture",
      "municipality": "Calgary",
      "sector": "Industrial",
      "stage": "Under Construction",
      "mw_mpi": null,
      "estimated_cost_millions": null,
      "schedule": "Commencing 2025",
      "registry_url": "https://majorprojects.alberta.caThe�eStruxtue CAL-1 Data Centre Phase 4 project will see alterations and improvements made to the existing� CAL-1 Data Centre. A building permit was issued by the City of Calgary on September 25, 2025.�",
      "mw_dc_load": null,
      "mw_btm_gen": null,
      "mw_canonical": null,
      "aeso_total_dts_mw": null,
      "aeso_allocations": [],
      "auc_filings": [],
      "news_signals": [],
      "municipal_permits": [],
      "score": {
        "rank": 2,
        "final": 86.5,
        "confidence": "high",
        "proponent_disclosed": true,
        "_paid_tier_note": "Per-component breakdown + math chain available in paid operator console."
      },
      "gen_set": {
        "applicable": false,
        "reason": "no_load_mw_and_no_thermal_gen",
        "project_class": "colocation"
      }
    },
    {
      "id": 1978,
      "source": "SEED",
      "source_id": "bell_ai_fabric_kamloops_p1",
      "name": "Bell AI Fabric — Kamloops Phase 1",
      "province": "BC",
      "proponent": "Bell Canada",
      "municipality": "Kamloops",
      "sector": "Industrial",
      "stage": "Operating",
      "mw_mpi": null,
      "estimated_cost_millions": null,
      "schedule": "Operating since Jun 2025",
      "registry_url": "https://www.cbc.ca/news/canada/british-columbia/bell-ai-new-data-centres-bc-1.7546516",
      "mw_dc_load": null,
      "mw_btm_gen": null,
      "mw_canonical": null,
      "aeso_total_dts_mw": null,
      "aeso_allocations": [],
      "auc_filings": [],
      "news_signals": [],
      "municipal_permits": [],
      "score": {
        "rank": 2,
        "final": 86.5,
        "confidence": "high",
        "proponent_disclosed": true,
        "_paid_tier_note": "Per-component breakdown + math chain available in paid operator console."
      },
      "gen_set": {
        "applicable": false,
        "reason": "no_load_mw_and_no_thermal_gen",
        "project_class": "telecom_hyperscale"
      }
    },
    {
      "id": 1979,
      "source": "SEED",
      "source_id": "bell_ai_fabric_merritt",
      "name": "Bell AI Fabric — Merritt Data Centre",
      "province": "BC",
      "proponent": "Bell Canada",
      "municipality": "Merritt",
      "sector": "Industrial",
      "stage": "Operating",
      "mw_mpi": null,
      "estimated_cost_millions": null,
      "schedule": "Opened end of 2025",
      "registry_url": "https://www.bctechnology.com/news/2025/5/28/Bell-Canada-to-Create-Data-Centre-Supercluster-in-British-Columbia-in-Canadas-Largest-Artificial-Intelligence-Compute-Project.cfm",
      "mw_dc_load": null,
      "mw_btm_gen": null,
      "mw_canonical": null,
      "aeso_total_dts_mw": null,
      "aeso_allocations": [],
      "auc_filings": [],
      "news_signals": [],
      "municipal_permits": [],
      "score": {
        "rank": 2,
        "final": 86.5,
        "confidence": "high",
        "proponent_disclosed": true,
        "_paid_tier_note": "Per-component breakdown + math chain available in paid operator console."
      },
      "gen_set": {
        "applicable": false,
        "reason": "no_load_mw_and_no_thermal_gen",
        "project_class": "telecom_hyperscale"
      }
    },
    {
      "id": 1980,
      "source": "SEED",
      "source_id": "bell_ai_fabric_kamloops_tru",
      "name": "Bell AI Fabric — Kamloops TRU Data Centre",
      "province": "BC",
      "proponent": "Bell Canada / Thompson Rivers University",
      "municipality": "Kamloops",
      "sector": "Industrial",
      "stage": "Under Construction",
      "mw_mpi": 26.0,
      "estimated_cost_millions": null,
      "schedule": "Construction 2025 — 2026",
      "registry_url": "https://www.cbc.ca/news/canada/british-columbia/kamloops-ai-data-centre-tru-9.7167647",
      "mw_dc_load": null,
      "mw_btm_gen": null,
      "mw_canonical": 26,
      "aeso_total_dts_mw": null,
      "aeso_allocations": [],
      "auc_filings": [],
      "news_signals": [],
      "municipal_permits": [],
      "score": {
        "rank": 2,
        "final": 86.5,
        "confidence": "high",
        "proponent_disclosed": true,
        "_paid_tier_note": "Per-component breakdown + math chain available in paid operator console."
      },
      "gen_set": {
        "applicable": true,
        "project_class": "telecom_hyperscale",
        "backup_units": 14,
        "backup_mw_total": 28,
        "backup_value_usd_m": [
          12.6,
          21.0
        ],
        "btm_prime": false,
        "btm_total_mw": null,
        "btm_unit_count": 0,
        "in_service_date": null,
        "procurement_window": null,
        "confidence": "low",
        "_paid_tier_note": "Per-unit equipment class, operator-practice citations, and methodology trail available in paid operator console."
      }
    },
    {
      "id": 1982,
      "source": "SEED",
      "source_id": "estruxture_van3_burnaby",
      "name": "eStruxture VAN-3 Burnaby Data Centre",
      "province": "BC",
      "proponent": "eStruxture Data Centers",
      "municipality": "Burnaby",
      "sector": "Industrial",
      "stage": "Operating",
      "mw_mpi": 7.0,
      "estimated_cost_millions": null,
      "schedule": null,
      "registry_url": "https://baxtel.com/data-center/british-columbia",
      "mw_dc_load": null,
      "mw_btm_gen": null,
      "mw_canonical": 7,
      "aeso_total_dts_mw": null,
      "aeso_allocations": [],
      "auc_filings": [],
      "news_signals": [],
      "municipal_permits": [],
      "score": {
        "rank": 2,
        "final": 86.5,
        "confidence": "high",
        "proponent_disclosed": true,
        "_paid_tier_note": "Per-component breakdown + math chain available in paid operator console."
      },
      "gen_set": {
        "applicable": true,
        "project_class": "colocation",
        "backup_units": 3,
        "backup_mw_total": 8,
        "backup_value_usd_m": [
          3.2,
          5.6
        ],
        "btm_prime": false,
        "btm_total_mw": null,
        "btm_unit_count": 0,
        "in_service_date": null,
        "procurement_window": null,
        "confidence": "low",
        "_paid_tier_note": "Per-unit equipment class, operator-practice citations, and methodology trail available in paid operator console."
      }
    },
    {
      "id": 1985,
      "source": "SEED",
      "source_id": "bell_sherwood_sk",
      "name": "Bell — RM of Sherwood AI Data Centre",
      "province": "SK",
      "proponent": "Bell Canada / Government of Saskatchewan",
      "municipality": "RM of Sherwood",
      "sector": "Industrial",
      "stage": "Pre-construction",
      "mw_mpi": 300.0,
      "estimated_cost_millions": 12000.0,
      "schedule": "Construction begins 2026; Phase 1 (200 MW) end 2026; Phase 2 end 2027",
      "registry_url": "https://www.saskatchewan.ca/government/news-and-media/2026/march/16/saskatchewan-welcomes-historic-investment-new-jobs-parnterships",
      "mw_dc_load": 300,
      "mw_btm_gen": null,
      "mw_canonical": 300,
      "aeso_total_dts_mw": 300,
      "aeso_allocations": [
        {
          "proj_no": "SP-BELL-001",
          "name": "Bell Sherwood AI Data Centre",
          "mw_type": "Data Load",
          "fuel_type": "SaskPower grid + SaskEnergy gas",
          "mw_dts": 300,
          "mw_sts": 300,
          "mw": 300,
          "in_service_date": "2026-12-31",
          "status": "Active",
          "stage": 3
        }
      ],
      "auc_filings": [],
      "news_signals": [],
      "municipal_permits": [],
      "score": {
        "rank": 7,
        "final": 82.05,
        "confidence": "high",
        "proponent_disclosed": true,
        "_paid_tier_note": "Per-component breakdown + math chain available in paid operator console."
      },
      "gen_set": {
        "applicable": true,
        "project_class": "telecom_hyperscale",
        "backup_units": 165,
        "backup_mw_total": 330,
        "backup_value_usd_m": [
          148.5,
          247.5
        ],
        "btm_prime": false,
        "btm_total_mw": null,
        "btm_unit_count": 0,
        "in_service_date": "2026-12-31",
        "procurement_window": [
          "2024-12",
          "2025-06"
        ],
        "confidence": "medium",
        "_paid_tier_note": "Per-unit equipment class, operator-practice citations, and methodology trail available in paid operator console."
      }
    },
    {
      "id": 1192,
      "source": "AB_MPI",
      "source_id": "10983",
      "name": "Greenlight Electricity Centre",
      "province": "AB",
      "proponent": "Pembina Pipeline and Kineticor JV",
      "municipality": "Sturgeon County",
      "sector": "Power",
      "stage": "Proposed",
      "mw_mpi": 1864.0,
      "estimated_cost_millions": 4500.0,
      "schedule": "Completion by 2029",
      "registry_url": "https://kineticor.ca/operation/greenlight-electricity-centre/",
      "mw_dc_load": 1800,
      "mw_btm_gen": 1398,
      "mw_canonical": 1800,
      "aeso_total_dts_mw": 1800,
      "aeso_allocations": [
        {
          "proj_no": "P2936",
          "name": "GLDC Load Phase 1.1",
          "mw_type": "Data Load",
          "fuel_type": "No Supply",
          "mw_dts": 970,
          "mw_sts": 0,
          "mw": 970,
          "in_service_date": "2027-05-01",
          "status": "Active",
          "stage": 2,
          "link_method": "projno_alias"
        },
        {
          "proj_no": "P3151",
          "name": "GLDC Load Phase 1.2",
          "mw_type": "Data Load",
          "fuel_type": "No Supply",
          "mw_dts": 830,
          "mw_sts": 0,
          "mw": 830,
          "in_service_date": null,
          "status": "ISD Under Review",
          "stage": 2,
          "link_method": "projno_alias"
        },
        {
          "proj_no": "P2533",
          "name": "Greenlight Gas",
          "mw_type": "Gas",
          "fuel_type": "Gas",
          "mw_dts": 20,
          "mw_sts": 466,
          "mw": 20,
          "in_service_date": "2028-06-01",
          "status": "Active",
          "stage": 3,
          "link_method": "token_overlap"
        },
        {
          "proj_no": "P2796",
          "name": "Greenlight U2 Gas",
          "mw_type": "Gas",
          "fuel_type": "Gas",
          "mw_dts": 20,
          "mw_sts": 466,
          "mw": 20,
          "in_service_date": "2028-06-01",
          "status": "Active",
          "stage": 3,
          "link_method": "token_overlap"
        },
        {
          "proj_no": "P2797",
          "name": "Greenlight U3 Gas",
          "mw_type": "Gas",
          "fuel_type": "Gas",
          "mw_dts": 20,
          "mw_sts": 466,
          "mw": 20,
          "in_service_date": "2028-06-01",
          "status": "Active",
          "stage": 3,
          "link_method": "token_overlap"
        }
      ],
      "auc_filings": [
        {
          "application": "30261-A001",
          "applicant": "Greenlight Electricity Centre",
          "description": "Application for the construction of an 1864MW combined cycle powerplant.",
          "date": "2025-08-28",
          "url": "https://efiling-webapi.auc.ab.ca/Proceeding/Search?proceeding=30261",
          "link_method": "applicant_match"
        }
      ],
      "news_signals": [],
      "municipal_permits": [],
      "score": {
        "rank": 8,
        "final": 79.85,
        "raw_weighted": 79.85,
        "confidence": "high",
        "confidence_cap": 100,
        "proponent_disclosed": true,
        "components": {
          "power_secured": {
            "score": 87,
            "weight_pct": 30,
            "why": "4 active AESO / AESO GENERATION allocation(s); max 970 MW DTS, AESO stage 3"
          },
          "land_control": {
            "score": 70,
            "weight_pct": 15,
            "why": "site identified (Sturgeon County), stage=proposed"
          },
          "zoning": {
            "score": 70,
            "weight_pct": 10,
            "why": "filed under power/natural gas — utility-industrial zone typical"
          },
          "permitting": {
            "score": 60,
            "weight_pct": 10,
            "why": "1 AUC filing(s)"
          },
          "capital_commitment": {
            "score": 100,
            "weight_pct": 15,
            "why": "$4,500M committed in MPI — major capex"
          },
          "proponent_track": {
            "score": 70,
            "weight_pct": 15,
            "why": "matched operator 'pembina' (tier 70)"
          },
          "timeline_credibility": {
            "score": 95,
            "weight_pct": 5,
            "why": "AESO ISD 2027-05-01 (~12 months out)"
          },
          "raw_weighted": 79.85,
          "disclosed_multiplier": 1.0,
          "after_disclosed_mult": 79.85,
          "confidence": "high",
          "confidence_why": "MPI entry + active power allocation",
          "confidence_cap": 100,
          "final": 79.85,
          "linked_allocations": [
            "P3151",
            "P2936",
            "P2533",
            "P2796",
            "P2797"
          ],
          "linked_filings": 1,
          "linked_news": 0
        }
      },
      "gen_set": {
        "applicable": true,
        "project_class": "hyperscale_ai",
        "project_class_reason": "pembina",
        "operator_practice": {
          "match": "pembina",
          "project_type": "hyperscale_ai",
          "summary": "Pembina/Kineticor JV (Greenlight) uses utility-scale combined-cycle gas turbines. Heavy-frame, EPC-direct from GE/Siemens/Mitsubishi — not packager territory.",
          "implied_class": "Heavy frame CCGT (GE 7HA / SGT-8000H / M501JAC class)",
          "implied_packager_relevant": false,
          "btm_implied": true,
          "source": "AESO Generation queue rows P2533, P2796, P2797 (Greenlight Gas units, 466 MW STS each)."
        },
        "backup_units": 827,
        "backup_mw_total": 2068,
        "backup_class": "Diesel/dual-fuel packaged gen-sets (2.5 MW class — Cat 3516E, MTU 4000, Cummins QSK)",
        "backup_value_usd_m": [
          827.2,
          1447.6
        ],
        "backup_profile": {
          "redundancy_factor": 1.0,
          "package_mw": 2.5,
          "rationale": "Tier 3/4 hyperscale: ~100% of IT load in 2.5 MW packages, N+1."
        },
        "btm_prime": true,
        "btm_total_mw": 1398,
        "btm_unit_count": 3,
        "btm_units": [
          {
            "proj_no": "P2533",
            "name": "Greenlight Gas",
            "mw": 466,
            "mw_type": "Gas",
            "fuel_type": "Gas",
            "isd": "2028-06-01",
            "status": "Active",
            "class": "Heavy frame turbines (GE 7HA, SGT-8000H, M501JAC class) — typically EPC-direct",
            "packager": false,
            "value_usd_m": [
              279.6,
              466.0
            ],
            "is_cancelled": false
          },
          {
            "proj_no": "P2796",
            "name": "Greenlight U2 Gas",
            "mw": 466,
            "mw_type": "Gas",
            "fuel_type": "Gas",
            "isd": "2028-06-01",
            "status": "Active",
            "class": "Heavy frame turbines (GE 7HA, SGT-8000H, M501JAC class) — typically EPC-direct",
            "packager": false,
            "value_usd_m": [
              279.6,
              466.0
            ],
            "is_cancelled": false
          },
          {
            "proj_no": "P2797",
            "name": "Greenlight U3 Gas",
            "mw": 466,
            "mw_type": "Gas",
            "fuel_type": "Gas",
            "isd": "2028-06-01",
            "status": "Active",
            "class": "Heavy frame turbines (GE 7HA, SGT-8000H, M501JAC class) — typically EPC-direct",
            "packager": false,
            "value_usd_m": [
              279.6,
              466.0
            ],
            "is_cancelled": false
          }
        ],
        "btm_classes_present": [
          "Heavy frame turbines (GE 7HA, SGT-8000H, M501JAC class) — typically EPC-direct"
        ],
        "btm_packager_target": false,
        "btm_signal_source": "aeso_thermal_gen_linked",
        "btm_value_usd_m": [
          838.8,
          1398.0
        ],
        "btm_mw": 466,
        "btm_fuel": "Gas",
        "btm_class": "Heavy frame turbines (GE 7HA, SGT-8000H, M501JAC class) — typically EPC-direct",
        "inferred_prime": null,
        "fuel_hint_from_load": null,
        "auc_btm_keyword": null,
        "auc_tech_keyword": "combined cycle",
        "news_btm_keyword": null,
        "news_tech_keyword": null,
        "in_service_date": "2027-05-01",
        "procurement_window": [
          "2025-05",
          "2025-11"
        ],
        "confidence": "high",
        "methodology": [
          {
            "step": "Project classification",
            "finding": "hyperscale_ai",
            "source": "pembina"
          },
          {
            "step": "Operator-practice lookup",
            "finding": "Pembina/Kineticor JV (Greenlight) uses utility-scale combined-cycle gas turbines. Heavy-frame, EPC-direct from GE/Siemens/Mitsubishi — not packager territory.",
            "source": "AESO Generation queue rows P2533, P2796, P2797 (Greenlight Gas units, 466 MW STS each)."
          },
          {
            "step": "Backup-gen sizing (hyperscale_ai)",
            "finding": "827 units × 2.5 MW = 2068 MW total",
            "source": "Tier 3/4 hyperscale: ~100% of IT load in 2.5 MW packages, N+1."
          },
          {
            "step": "BTM prime — confirmed",
            "finding": "3 thermal generation row(s) linked in AESO Generation queue, totaling 1398 MW STS",
            "source": "AESO Long-term Adequacy report — power_allocations rows: P2533, P2796, P2797"
          }
        ]
      }
    },
    {
      "id": 1773,
      "source": "AB_MPI",
      "source_id": "11890",
      "name": "Blindman Industrial Park AI Data Centre",
      "province": "AB",
      "proponent": "Havenz Smart Communities",
      "municipality": "Red Deer County",
      "sector": "Industrial",
      "stage": "Under Construction",
      "mw_mpi": null,
      "estimated_cost_millions": null,
      "schedule": "2026 - 2026",
      "registry_url": "https://majorprojects.alberta.caA new artificial intelligence data centre has been approved for Red Deer County in the Blindman Industrial Park, designed as a water-less, ultra-low noise facility on a 120-acre site with its own heat and power plant. The project will include a nearly 10,800-square-foot modular data centre and a 5,000-square-foot administration building, and is expected to employ five to seven people. Location on the map is not precise.�",
      "mw_dc_load": null,
      "mw_btm_gen": null,
      "mw_canonical": null,
      "aeso_total_dts_mw": null,
      "aeso_allocations": [],
      "auc_filings": [],
      "news_signals": [],
      "municipal_permits": [],
      "score": {
        "rank": 9,
        "final": 77.5,
        "confidence": "high",
        "proponent_disclosed": true,
        "_paid_tier_note": "Per-component breakdown + math chain available in paid operator console."
      },
      "gen_set": {
        "applicable": false,
        "reason": "no_load_mw_and_no_thermal_gen",
        "project_class": "hyperscale_ai"
      }
    },
    {
      "id": 1986,
      "source": "SEED",
      "source_id": "transalta_keephills_dc",
      "name": "TransAlta Keephills Data Centre",
      "province": "AB",
      "proponent": "TransAlta + CPP Investments + Brookfield",
      "municipality": "Parkland County",
      "sector": "Industrial",
      "stage": "Pre-construction",
      "mw_mpi": 861.0,
      "estimated_cost_millions": null,
      "schedule": "Phase 1.1 (230 MW) in-service 2027; full 861 MW by Phase 2",
      "registry_url": "https://transalta.com/newsroom/transalta-enters-memorandum-of-understanding-for-data-centre-development-at-keephills-site-with-potential-to-scale-up-to-1-gw/",
      "mw_dc_load": 861,
      "mw_btm_gen": null,
      "mw_canonical": 861,
      "aeso_total_dts_mw": 861,
      "aeso_allocations": [
        {
          "proj_no": "P3095",
          "name": "Keephills Data Centre Phase 2",
          "mw_type": "Data Load",
          "fuel_type": "No Supply",
          "mw_dts": 466,
          "mw_sts": 0,
          "mw": 466,
          "in_service_date": null,
          "status": "ISD Under Review",
          "stage": 2
        },
        {
          "proj_no": "P3083",
          "name": "Keephills Data Centre Phase 1.1",
          "mw_type": "Data Load",
          "fuel_type": "No Supply",
          "mw_dts": 230,
          "mw_sts": 0,
          "mw": 230,
          "in_service_date": "2027-01-01",
          "status": "Active",
          "stage": 2
        },
        {
          "proj_no": "P3152",
          "name": "Keephills Data Centre Phase 1.2",
          "mw_type": "Data Load",
          "fuel_type": "No Supply",
          "mw_dts": 165,
          "mw_sts": 0,
          "mw": 165,
          "in_service_date": null,
          "status": "ISD Under Review",
          "stage": 2
        }
      ],
      "auc_filings": [
        {
          "application": "30511-A001",
          "applicant": "TransAlta Corporation",
          "description": "TransAlta Keephills 1 Repowering Project Application",
          "date": "2025-12-17",
          "url": "https://efiling-webapi.auc.ab.ca/Proceeding/Search?proceeding=30511"
        }
      ],
      "news_signals": [],
      "municipal_permits": [],
      "score": {
        "rank": 10,
        "final": 66.45,
        "confidence": "high",
        "proponent_disclosed": true,
        "_paid_tier_note": "Per-component breakdown + math chain available in paid operator console."
      },
      "gen_set": {
        "applicable": true,
        "project_class": "hyperscale_ai",
        "backup_units": 396,
        "backup_mw_total": 990,
        "backup_value_usd_m": [
          396.0,
          693.0
        ],
        "btm_prime": false,
        "btm_total_mw": null,
        "btm_unit_count": 0,
        "in_service_date": "2027-01-01",
        "procurement_window": [
          "2025-01",
          "2025-07"
        ],
        "confidence": "medium",
        "_paid_tier_note": "Per-unit equipment class, operator-practice citations, and methodology trail available in paid operator console."
      }
    },
    {
      "id": 1987,
      "source": "SEED",
      "source_id": "capital_power_polaris_genesee",
      "name": "Capital Power Polaris @ Genesee Energy Campus",
      "province": "AB",
      "proponent": "Capital Power (data centre developer unnamed)",
      "municipality": "Parkland County",
      "sector": "Industrial",
      "stage": "Pre-construction",
      "mw_mpi": 1000.0,
      "estimated_cost_millions": null,
      "schedule": "First 250 MW expected 2028 start",
      "registry_url": "https://www.capitalpower.com/pgec/",
      "mw_dc_load": 1500,
      "mw_btm_gen": 1663,
      "mw_canonical": 1500,
      "aeso_total_dts_mw": 1500,
      "aeso_allocations": [
        {
          "proj_no": "P2942",
          "name": "Genesee Data Center 1 MPC Load",
          "mw_type": "Data Load",
          "fuel_type": "No Supply",
          "mw_dts": 1000,
          "mw_sts": 0,
          "mw": 1000,
          "in_service_date": null,
          "status": "ISD Under Review",
          "stage": 2
        },
        {
          "proj_no": "P2946",
          "name": "Genesee Data Center 2 MPC Load",
          "mw_type": "Data Load",
          "fuel_type": "No Supply",
          "mw_dts": 500,
          "mw_sts": 0,
          "mw": 500,
          "in_service_date": null,
          "status": "ISD Under Review",
          "stage": 2
        },
        {
          "proj_no": "P2975",
          "name": "Genesee MPC Gas",
          "mw_type": "Gas",
          "fuel_type": "Gas",
          "mw_dts": 24,
          "mw_sts": 1463,
          "mw": 24,
          "in_service_date": "2029-03-01",
          "status": "Active",
          "stage": 3
        },
        {
          "proj_no": "P3074",
          "name": "Genesee 330P Modification",
          "mw_type": "Gas",
          "fuel_type": "Gas",
          "mw_dts": 0,
          "mw_sts": 200,
          "mw": 0,
          "in_service_date": null,
          "status": "ISD Under Review",
          "stage": 2
        }
      ],
      "auc_filings": [],
      "news_signals": [],
      "municipal_permits": [],
      "score": {
        "rank": 11,
        "final": 61.9,
        "confidence": "high",
        "proponent_disclosed": true,
        "_paid_tier_note": "Per-component breakdown + math chain available in paid operator console."
      },
      "gen_set": {
        "applicable": true,
        "project_class": "hyperscale_ai",
        "backup_units": 690,
        "backup_mw_total": 1725,
        "backup_value_usd_m": [
          690.0,
          1207.5
        ],
        "btm_prime": true,
        "btm_total_mw": 1663,
        "btm_unit_count": 2,
        "in_service_date": "2029-03-01",
        "procurement_window": [
          "2027-03",
          "2027-09"
        ],
        "confidence": "high",
        "_paid_tier_note": "Per-unit equipment class, operator-practice citations, and methodology trail available in paid operator console."
      }
    },
    {
      "id": 1886,
      "source": "AB_MPI",
      "source_id": "12013",
      "name": "Synapse Olds Data Centre",
      "province": "AB",
      "proponent": "Synapse Data Center Inc.",
      "municipality": "Olds",
      "sector": "Industrial",
      "stage": "Proposed",
      "mw_mpi": null,
      "estimated_cost_millions": 10000.0,
      "schedule": null,
      "registry_url": "https://synapsedatacenter.com/",
      "mw_dc_load": null,
      "mw_btm_gen": null,
      "mw_canonical": null,
      "aeso_total_dts_mw": null,
      "aeso_allocations": [],
      "auc_filings": [
        {
          "application": "30732-A001",
          "applicant": "Synapse Real Estate Corp",
          "description": "Synapse Real Estate Corp, is seeking approval to construct and operate the Synapse Data Center, a 1.4GW (nominal capacity) natural gas-fired power plant with 1.8GW of emergency/backup diesel generators, with an attached 1GW Data Center.",
          "date": "2026-04-03",
          "url": "https://efiling-webapi.auc.ab.ca/Proceeding/Search?proceeding=30732"
        }
      ],
      "news_signals": [],
      "municipal_permits": [],
      "score": {
        "rank": 12,
        "final": 57.5,
        "confidence": "medium",
        "proponent_disclosed": true,
        "_paid_tier_note": "Per-component breakdown + math chain available in paid operator console."
      },
      "gen_set": {
        "applicable": false,
        "reason": "no_load_mw_and_no_thermal_gen",
        "project_class": "hyperscale_ai"
      }
    },
    {
      "id": 1981,
      "source": "SEED",
      "source_id": "bell_ai_fabric_kamloops_2027",
      "name": "Bell AI Fabric — Kamloops 2027 Data Centre",
      "province": "BC",
      "proponent": "Bell Canada",
      "municipality": "Kamloops",
      "sector": "Industrial",
      "stage": "Pre-construction",
      "mw_mpi": 26.0,
      "estimated_cost_millions": null,
      "schedule": null,
      "registry_url": "https://www.datacenterdynamics.com/en/news/bell-ai-fabric-bell-canada-plans-ai-data-center-supercluster-with-500mw-in-british-columbia/",
      "mw_dc_load": null,
      "mw_btm_gen": null,
      "mw_canonical": 26,
      "aeso_total_dts_mw": null,
      "aeso_allocations": [],
      "auc_filings": [],
      "news_signals": [],
      "municipal_permits": [],
      "score": {
        "rank": 13,
        "final": 57.0,
        "confidence": "low",
        "proponent_disclosed": true,
        "_paid_tier_note": "Per-component breakdown + math chain available in paid operator console."
      },
      "gen_set": {
        "applicable": true,
        "project_class": "telecom_hyperscale",
        "backup_units": 14,
        "backup_mw_total": 28,
        "backup_value_usd_m": [
          12.6,
          21.0
        ],
        "btm_prime": false,
        "btm_total_mw": null,
        "btm_unit_count": 0,
        "in_service_date": null,
        "procurement_window": null,
        "confidence": "low",
        "_paid_tier_note": "Per-unit equipment class, operator-practice citations, and methodology trail available in paid operator console."
      }
    },
    {
      "id": 1843,
      "source": "AB_MPI",
      "source_id": "11969",
      "name": "Technologies New Energy & Data District Data Centres (Phase 1)",
      "province": "AB",
      "proponent": "Technologies New Energy (TNE) and Data District Inc.",
      "municipality": "Olds|Calgary|Edmonton|Bonnyville No. 87",
      "sector": "Industrial",
      "stage": "Proposed",
      "mw_mpi": null,
      "estimated_cost_millions": 1260.0,
      "schedule": "Commencing 2026",
      "registry_url": "https://majorprojects.alberta.caPhase one of this investment is expected to include four data centre projects in Olds, Bonnyville, Calgary and Edmonton regions with a combined development budget of $1.26 billion (?780 million), and combined capacity of 240 MW.� This investment reflects growing global demand for secure, reliable digital infrastructure and highlights Alberta's strengths as a destination for investment in energy-enabled technology projects. Location on the map is a placeholder and is not precise.  Construction on the first facility in Olds will begin in 2026, and the second facility in Bonnyville in 2027.�",
      "mw_dc_load": null,
      "mw_btm_gen": null,
      "mw_canonical": null,
      "aeso_total_dts_mw": null,
      "aeso_allocations": [],
      "auc_filings": [],
      "news_signals": [],
      "municipal_permits": [],
      "score": {
        "rank": 14,
        "final": 53.0,
        "confidence": "medium",
        "proponent_disclosed": true,
        "_paid_tier_note": "Per-component breakdown + math chain available in paid operator console."
      },
      "gen_set": {
        "applicable": false,
        "reason": "no_load_mw_and_no_thermal_gen",
        "project_class": "stranded_gas_compute"
      }
    },
    {
      "id": 1458,
      "source": "AB_MPI",
      "source_id": "11518",
      "name": "Gryphon Digital Alberta AI and Data Center",
      "province": "AB",
      "proponent": "Gryphon Digital Mining",
      "municipality": "Pincher Creek No. 9",
      "sector": "Industrial",
      "stage": "Proposed",
      "mw_mpi": null,
      "estimated_cost_millions": null,
      "schedule": "Completion by 2026",
      "registry_url": "https://majorprojects.alberta.caGryphon Digital mining has signed a definitive agreement to acquire Captus Energy's 850-acre industrial site in Southern Alberta near Pincher Creek. The site will enable the Gryphon Digital Mining's expansion into AI and high-performance computing (HPC) data center infrastructure, with the site producing up to ~130MW by the end of 2026. The acquired asset has the potential to scale to 4 GW of reliable, sustainable power generation capacity through gas to power generation and carbon sequestration on site. Location on map is not exact.",
      "mw_dc_load": 74,
      "mw_btm_gen": 150,
      "mw_canonical": 74,
      "aeso_total_dts_mw": 74,
      "aeso_allocations": [
        {
          "proj_no": "P3079",
          "name": "Captus Load",
          "mw_type": "Data Load",
          "fuel_type": "No Supply",
          "mw_dts": 74,
          "mw_sts": 0,
          "mw": 74,
          "in_service_date": "2027-09-01",
          "status": "Active",
          "stage": 2
        },
        {
          "proj_no": "P3004",
          "name": "Captus MPC Cogen",
          "mw_type": "Cogen",
          "fuel_type": "Gas",
          "mw_dts": 10,
          "mw_sts": 150,
          "mw": 10,
          "in_service_date": null,
          "status": "Recently Cancelled",
          "stage": 2
        }
      ],
      "auc_filings": [],
      "news_signals": [],
      "municipal_permits": [],
      "score": {
        "rank": 15,
        "final": 52.35,
        "confidence": "high",
        "proponent_disclosed": true,
        "_paid_tier_note": "Per-component breakdown + math chain available in paid operator console."
      },
      "gen_set": {
        "applicable": true,
        "project_class": "mining",
        "backup_units": 4,
        "backup_mw_total": 6,
        "backup_value_usd_m": [
          1.8,
          3.0
        ],
        "btm_prime": false,
        "btm_total_mw": null,
        "btm_unit_count": 0,
        "in_service_date": "2027-09-01",
        "procurement_window": [
          "2025-09",
          "2026-03"
        ],
        "confidence": "low",
        "_paid_tier_note": "Per-unit equipment class, operator-practice citations, and methodology trail available in paid operator console."
      }
    },
    {
      "id": 1487,
      "source": "AB_MPI",
      "source_id": "11556",
      "name": "Crusoe AI Data Centres Alberta",
      "province": "AB",
      "proponent": "Crusoe AI",
      "municipality": "Brazeau County|Red Deer County|Rocky View County",
      "sector": "Industrial",
      "stage": "Proposed",
      "mw_mpi": null,
      "estimated_cost_millions": 3000.0,
      "schedule": null,
      "registry_url": "https://majorprojects.alberta.caArtificial intelligence data centre developer Crusoe has entered into a multi-year framework agreement with natural gas-fired power provider Kalina Distributed Power (KDP) to develop multiple colocated AI data centres powered by natural gas power plants in Alberta. Crusoe will develop, own, and operate the data centres and purchase power from three KDP-owned 170 MW gas-fired power plants through Power Purchase Agreements (PPA) with a minimum term of 15 years. The three project locations identified are KDP's 65-acre Myers Energy Park, 160-acre Alsike Energy Park, and the newly secured 320-acre Crossfield Energy Park. Each plant represents gross unlevered capex of CAD$1 billion.\r\n \r\n\r\nLocations on the map are not exact.",
      "mw_dc_load": 840,
      "mw_btm_gen": 534,
      "mw_canonical": 840,
      "aeso_total_dts_mw": 840,
      "aeso_allocations": [
        {
          "proj_no": "P3153",
          "name": "Alsike Energy Park MPC Data Load",
          "mw_type": "Data Load",
          "fuel_type": "No Supply",
          "mw_dts": 280,
          "mw_sts": 0,
          "mw": 280,
          "in_service_date": null,
          "status": "ISD Under Review",
          "stage": 2,
          "link_method": "projno_alias"
        },
        {
          "proj_no": "P3154",
          "name": "Lone Pine Energy Park MPC Data Load",
          "mw_type": "Data Load",
          "fuel_type": "No Supply",
          "mw_dts": 280,
          "mw_sts": 0,
          "mw": 280,
          "in_service_date": null,
          "status": "ISD Under Review",
          "stage": 2,
          "link_method": "projno_alias"
        },
        {
          "proj_no": "P3155",
          "name": "Myers Energy Park MPC Data Load",
          "mw_type": "Data Load",
          "fuel_type": "No Supply",
          "mw_dts": 280,
          "mw_sts": 0,
          "mw": 280,
          "in_service_date": null,
          "status": "ISD Under Review",
          "stage": 2,
          "link_method": "projno_alias"
        },
        {
          "proj_no": "P2979",
          "name": "Alsike Energy Park MPC Gas",
          "mw_type": "Gas",
          "fuel_type": "Gas",
          "mw_dts": 3,
          "mw_sts": 178,
          "mw": 3,
          "in_service_date": null,
          "status": "ISD Under Review",
          "stage": 2,
          "link_method": "projno_alias"
        },
        {
          "proj_no": "P2980",
          "name": "Lone Pine Energy Park MPC Gas",
          "mw_type": "Gas",
          "fuel_type": "Gas",
          "mw_dts": 3,
          "mw_sts": 178,
          "mw": 3,
          "in_service_date": null,
          "status": "ISD Under Review",
          "stage": 2,
          "link_method": "projno_alias"
        },
        {
          "proj_no": "P2981",
          "name": "Myers Energy Park MPC Gas",
          "mw_type": "Gas",
          "fuel_type": "Gas",
          "mw_dts": 3,
          "mw_sts": 178,
          "mw": 3,
          "in_service_date": null,
          "status": "ISD Under Review",
          "stage": 2,
          "link_method": "projno_alias"
        }
      ],
      "auc_filings": [],
      "news_signals": [],
      "municipal_permits": [],
      "score": {
        "rank": 16,
        "final": 52.1,
        "raw_weighted": 52.1,
        "confidence": "medium",
        "confidence_cap": 80,
        "proponent_disclosed": true,
        "components": {
          "power_secured": {
            "score": 37,
            "weight_pct": 30,
            "why": "6 AESO / AESO GENERATION allocation(s) under review at AESO stage 2; max 280 MW DTS"
          },
          "land_control": {
            "score": 50,
            "weight_pct": 15,
            "why": "multiple municipalities listed (Brazeau County|Red Deer County|Rocky View County)"
          },
          "zoning": {
            "score": 70,
            "weight_pct": 10,
            "why": "filed under industrial sector — zoning likely in place"
          },
          "permitting": {
            "score": 0,
            "weight_pct": 10,
            "why": "announced only — no filings"
          },
          "capital_commitment": {
            "score": 100,
            "weight_pct": 15,
            "why": "$3,000M committed in MPI — major capex"
          },
          "proponent_track": {
            "score": 70,
            "weight_pct": 15,
            "why": "matched operator 'crusoe' (tier 70)"
          },
          "timeline_credibility": {
            "score": 20,
            "weight_pct": 5,
            "why": "no firm timeline"
          },
          "raw_weighted": 52.1,
          "disclosed_multiplier": 1.0,
          "after_disclosed_mult": 52.1,
          "confidence": "medium",
          "confidence_why": "MPI + power allocation",
          "confidence_cap": 80,
          "final": 52.1,
          "linked_allocations": [
            "P3153",
            "P3154",
            "P3155",
            "P2979",
            "P2980",
            "P2981"
          ],
          "linked_filings": 0,
          "linked_news": 0
        }
      },
      "gen_set": {
        "applicable": true,
        "project_class": "stranded_gas_compute",
        "project_class_reason": "crusoe",
        "operator_practice": {
          "match": "crusoe",
          "project_type": "stranded_gas_compute",
          "summary": "Crusoe Energy Systems pioneered stranded-gas-to-compute. Each Crusoe energy park typically runs distributed Caterpillar G3500-series natural-gas reciprocating engines (1-3 MW per unit) behind the meter. The reciprocating fleet IS the prime power source.",
          "implied_class": "Reciprocating gas engines (Cat G3500 / G3520 series, 1-3 MW per unit)",
          "implied_packager_relevant": true,
          "btm_implied": true,
          "source": "Crusoe Energy Systems public marketing materials; AER methane-reduction filings; Cat dealer announcements (Toromont/Finning)."
        },
        "backup_units": 0,
        "backup_mw_total": 0,
        "backup_class": "n/a — distributed reciprocating fleet IS the prime",
        "backup_value_usd_m": [
          0.0,
          0.0
        ],
        "backup_profile": {
          "redundancy_factor": 0.0,
          "package_mw": 0.0,
          "rationale": "Distributed reciprocating engines ARE the prime power source — no separate backup tier (operator-practice based)."
        },
        "btm_prime": true,
        "btm_total_mw": 534,
        "btm_unit_count": 3,
        "btm_units": [
          {
            "proj_no": "P2979",
            "name": "Alsike Energy Park MPC Gas",
            "mw": 178,
            "mw_type": "Gas",
            "fuel_type": "Gas",
            "isd": null,
            "status": "ISD Under Review",
            "class": "Aero-derivative turbines (LM6000, SGT-A class) — semi-packageable",
            "packager": true,
            "value_usd_m": [
              124.6,
              213.6
            ],
            "is_cancelled": false
          },
          {
            "proj_no": "P2980",
            "name": "Lone Pine Energy Park MPC Gas",
            "mw": 178,
            "mw_type": "Gas",
            "fuel_type": "Gas",
            "isd": null,
            "status": "ISD Under Review",
            "class": "Aero-derivative turbines (LM6000, SGT-A class) — semi-packageable",
            "packager": true,
            "value_usd_m": [
              124.6,
              213.6
            ],
            "is_cancelled": false
          },
          {
            "proj_no": "P2981",
            "name": "Myers Energy Park MPC Gas",
            "mw": 178,
            "mw_type": "Gas",
            "fuel_type": "Gas",
            "isd": null,
            "status": "ISD Under Review",
            "class": "Aero-derivative turbines (LM6000, SGT-A class) — semi-packageable",
            "packager": true,
            "value_usd_m": [
              124.6,
              213.6
            ],
            "is_cancelled": false
          }
        ],
        "btm_classes_present": [
          "Aero-derivative turbines (LM6000, SGT-A class) — semi-packageable"
        ],
        "btm_packager_target": true,
        "btm_signal_source": "aeso_thermal_gen_linked",
        "btm_value_usd_m": [
          373.8,
          640.8
        ],
        "btm_mw": 178,
        "btm_fuel": "Gas",
        "btm_class": "Aero-derivative turbines (LM6000, SGT-A class) — semi-packageable",
        "inferred_prime": null,
        "fuel_hint_from_load": null,
        "auc_btm_keyword": null,
        "auc_tech_keyword": null,
        "news_btm_keyword": null,
        "news_tech_keyword": null,
        "in_service_date": null,
        "procurement_window": null,
        "confidence": "high",
        "methodology": [
          {
            "step": "Project classification",
            "finding": "stranded_gas_compute",
            "source": "crusoe"
          },
          {
            "step": "Operator-practice lookup",
            "finding": "Crusoe Energy Systems pioneered stranded-gas-to-compute. Each Crusoe energy park typically runs distributed Caterpillar G3500-series natural-gas reciprocating engines (1-3 MW per unit) behind the meter. The reciprocating fleet IS the prime power source.",
            "source": "Crusoe Energy Systems public marketing materials; AER methane-reduction filings; Cat dealer announcements (Toromont/Finning)."
          },
          {
            "step": "Backup-gen sizing (stranded_gas_compute)",
            "finding": "0 units × 0.0 MW = 0 MW total",
            "source": "Distributed reciprocating engines ARE the prime power source — no separate backup tier (operator-practice based)."
          },
          {
            "step": "BTM prime — confirmed",
            "finding": "3 thermal generation row(s) linked in AESO Generation queue, totaling 534 MW STS",
            "source": "AESO Long-term Adequacy report — power_allocations rows: P2979, P2980, P2981"
          }
        ]
      }
    },
    {
      "id": 1425,
      "source": "AB_MPI",
      "source_id": "11477",
      "name": "Wonder Valley AI Data Centre Park (Phase 1)",
      "province": "AB",
      "proponent": "O'Leary Ventures",
      "municipality": "Greenview No. 16",
      "sector": "Industrial",
      "stage": "Proposed",
      "mw_mpi": null,
      "estimated_cost_millions": 12000.0,
      "schedule": null,
      "registry_url": "https://olearyventures.com/wondervalley/",
      "mw_dc_load": null,
      "mw_btm_gen": null,
      "mw_canonical": null,
      "aeso_total_dts_mw": null,
      "aeso_allocations": [],
      "auc_filings": [],
      "news_signals": [],
      "municipal_permits": [],
      "score": {
        "rank": 17,
        "final": 51.5,
        "confidence": "medium",
        "proponent_disclosed": true,
        "_paid_tier_note": "Per-component breakdown + math chain available in paid operator console."
      },
      "gen_set": {
        "applicable": false,
        "reason": "no_load_mw_and_no_thermal_gen",
        "project_class": "hyperscale_ai"
      }
    },
    {
      "id": 1436,
      "source": "AB_MPI",
      "source_id": "11490",
      "name": "Beacon Foothills Artificial Intelligence Hub",
      "province": "AB",
      "proponent": "Beacon Data Centers",
      "municipality": "Foothills No. 31",
      "sector": "Industrial",
      "stage": "Proposed",
      "mw_mpi": null,
      "estimated_cost_millions": 4000.0,
      "schedule": null,
      "registry_url": "https://majorprojects.alberta.caThe proponent is proposing to build a new data center known as the Beacon Foothills Artificial Intelligence Hub. The facility will contain 400 MW on onsite power generation capacity, along with two five story buildings. The project will create 300 jobs once operational. Approvals are being sought.",
      "mw_dc_load": 400,
      "mw_btm_gen": null,
      "mw_canonical": 400,
      "aeso_total_dts_mw": 400,
      "aeso_allocations": [
        {
          "proj_no": "P2926",
          "name": "Beacon Foothills A.I. Hub Load",
          "mw_type": "Data Load",
          "fuel_type": "No Supply",
          "mw_dts": 400,
          "mw_sts": 0,
          "mw": 400,
          "in_service_date": null,
          "status": "ISD Under Review",
          "stage": 2
        }
      ],
      "auc_filings": [],
      "news_signals": [],
      "municipal_permits": [],
      "score": {
        "rank": 18,
        "final": 51.2,
        "confidence": "medium",
        "proponent_disclosed": true,
        "_paid_tier_note": "Per-component breakdown + math chain available in paid operator console."
      },
      "gen_set": {
        "applicable": true,
        "project_class": "hyperscale_ai",
        "backup_units": 184,
        "backup_mw_total": 460,
        "backup_value_usd_m": [
          184.0,
          322.0
        ],
        "btm_prime": false,
        "btm_total_mw": null,
        "btm_unit_count": 0,
        "in_service_date": null,
        "procurement_window": null,
        "confidence": "low",
        "_paid_tier_note": "Per-unit equipment class, operator-practice citations, and methodology trail available in paid operator console."
      }
    },
    {
      "id": 2010,
      "source": "SEED",
      "source_id": "beacon_indus",
      "name": "Beacon AI Centers — Indus",
      "province": "AB",
      "proponent": "Beacon Data Centers",
      "municipality": "Rocky View County",
      "sector": "Industrial",
      "stage": "Pre-construction",
      "mw_mpi": null,
      "estimated_cost_millions": null,
      "schedule": "AUC thermal power plant application filed Dec 2025",
      "registry_url": "https://www.auc.ab.ca/regulatory_documents/current-applications/",
      "mw_dc_load": null,
      "mw_btm_gen": null,
      "mw_canonical": null,
      "aeso_total_dts_mw": null,
      "aeso_allocations": [],
      "auc_filings": [
        {
          "application": "30524-A001",
          "applicant": "Indus Power Generation LP",
          "description": "Beacon AI Centers - Indus Project Thermal Power Plant Application",
          "date": "2025-12-29",
          "url": "https://efiling-webapi.auc.ab.ca/Proceeding/Search?proceeding=30524"
        },
        {
          "application": "30518-A001",
          "applicant": "Heartland Power Generation LP",
          "description": "Beacon AI Centers – Heartland Project Thermal Power Plant Application",
          "date": "2025-12-19",
          "url": "https://efiling-webapi.auc.ab.ca/Proceeding/Search?proceeding=30518"
        }
      ],
      "news_signals": [],
      "municipal_permits": [],
      "score": {
        "rank": 19,
        "final": 51.0,
        "confidence": "medium",
        "proponent_disclosed": true,
        "_paid_tier_note": "Per-component breakdown + math chain available in paid operator console."
      },
      "gen_set": {
        "applicable": false,
        "reason": "no_load_mw_and_no_thermal_gen",
        "project_class": "hyperscale_ai"
      }
    },
    {
      "id": 2011,
      "source": "SEED",
      "source_id": "amarda_nowlit_wabasca",
      "name": "Nowlit Stranded-Gas Crypto Mining Site",
      "province": "AB",
      "proponent": "Amarda Nowlit Energy Ltd.",
      "municipality": "Opportunity No. 17 (Wabasca-Demarais area)",
      "sector": "Industrial",
      "stage": "Pre-construction",
      "mw_mpi": 9.5,
      "estimated_cost_millions": null,
      "schedule": "AUC power plant application filed Apr 2026",
      "registry_url": "https://www.auc.ab.ca/regulatory_documents/current-applications/",
      "mw_dc_load": null,
      "mw_btm_gen": null,
      "mw_canonical": 9,
      "aeso_total_dts_mw": null,
      "aeso_allocations": [],
      "auc_filings": [
        {
          "application": "30707-A001",
          "applicant": "Amarda Nowlit Energy Ltd.",
          "description": "Nowlit is proposing to construct and operate a 9.50 MW (gross output) natural gas-fired\npower plant, (the Project) approximately 10km north of Wabasca-Demarais, Alberta. The\nProject is a power plant consisting of five (5) x 1900kW natural gas generators (1.9 MW), with\na total facility output of 9.50MW. The project will include 5 data center containers to support\nelectronic currency data mining. The project is located on crown land within 16-36-08-25\nW4M.",
          "date": "2026-04-09",
          "url": "https://efiling-webapi.auc.ab.ca/Proceeding/Search?proceeding=30707"
        }
      ],
      "news_signals": [],
      "municipal_permits": [],
      "score": {
        "rank": 20,
        "final": 48.0,
        "confidence": "medium",
        "proponent_disclosed": true,
        "_paid_tier_note": "Per-component breakdown + math chain available in paid operator console."
      },
      "gen_set": {
        "applicable": true,
        "project_class": "mining",
        "backup_units": 0,
        "backup_mw_total": 0,
        "backup_value_usd_m": [
          0.0,
          0.0
        ],
        "btm_prime": false,
        "btm_total_mw": null,
        "btm_unit_count": 0,
        "in_service_date": null,
        "procurement_window": null,
        "confidence": "low",
        "_paid_tier_note": "Per-unit equipment class, operator-practice citations, and methodology trail available in paid operator console."
      }
    },
    {
      "id": 2012,
      "source": "SEED",
      "source_id": "nps_industrial_power",
      "name": "NPS Industrial Power Self-Power DC",
      "province": "AB",
      "proponent": "NPS Industrial Power Corporation",
      "municipality": "Vulcan County area",
      "sector": "Industrial",
      "stage": "Pre-construction",
      "mw_mpi": 10.0,
      "estimated_cost_millions": null,
      "schedule": "AUC power plant application filed Apr 2026",
      "registry_url": "https://www.auc.ab.ca/regulatory_documents/current-applications/",
      "mw_dc_load": null,
      "mw_btm_gen": null,
      "mw_canonical": 10,
      "aeso_total_dts_mw": null,
      "aeso_allocations": [],
      "auc_filings": [
        {
          "application": "30724-A001",
          "applicant": "NPS Industrial Power Corporation",
          "description": "NPS Industrial Power Corp. 10 MW, self power, natural gas fired power plant and data center, SW 1/4-8-18-18 W4",
          "date": "2026-04-07",
          "url": "https://efiling-webapi.auc.ab.ca/Proceeding/Search?proceeding=30724"
        }
      ],
      "news_signals": [],
      "municipal_permits": [],
      "score": {
        "rank": 20,
        "final": 48.0,
        "confidence": "medium",
        "proponent_disclosed": true,
        "_paid_tier_note": "Per-component breakdown + math chain available in paid operator console."
      },
      "gen_set": {
        "applicable": true,
        "project_class": "unknown",
        "backup_units": 4,
        "backup_mw_total": 10,
        "backup_value_usd_m": [
          4.0,
          7.0
        ],
        "btm_prime": false,
        "btm_total_mw": null,
        "btm_unit_count": 0,
        "in_service_date": null,
        "procurement_window": null,
        "confidence": "low",
        "_paid_tier_note": "Per-unit equipment class, operator-practice citations, and methodology trail available in paid operator console."
      }
    },
    {
      "id": 2013,
      "source": "SEED",
      "source_id": "278_alberta_schuler_btc",
      "name": "Schuler Stranded-Gas Bitcoin Mine",
      "province": "AB",
      "proponent": "2783294 Alberta Ltd.",
      "municipality": "Cypress County (Schuler area)",
      "sector": "Industrial",
      "stage": "Pre-construction",
      "mw_mpi": 9.8,
      "estimated_cost_millions": null,
      "schedule": "Cypress County DP 26/38 issued Apr 2026; AUC application filed May 2026",
      "registry_url": "https://www.auc.ab.ca/regulatory_documents/current-applications/",
      "mw_dc_load": null,
      "mw_btm_gen": null,
      "mw_canonical": 9,
      "aeso_total_dts_mw": null,
      "aeso_allocations": [],
      "auc_filings": [
        {
          "application": "30814-A001",
          "applicant": "2783294 Alberta Ltd.",
          "description": "Schuler 9.798MW Gas-fired Power Plant & Bitcoin Mine",
          "date": "2026-05-08",
          "url": "https://efiling-webapi.auc.ab.ca/Proceeding/Search?proceeding=30814"
        }
      ],
      "news_signals": [],
      "municipal_permits": [
        {
          "muni_source": "MUNI_CYPRESS",
          "permit_number": "26/38",
          "permit_type": "Development Permit",
          "address": "NW 7-16-1-W4 (16129 Rge Rd 20)",
          "description": "Placement of Gas Generator, Fuel Gas Skid & Bitcoin Miner, with conditions.",
          "applicant": null,
          "date": "2026-04-28",
          "url": "https://cypress.ab.ca/p/notices"
        }
      ],
      "score": {
        "rank": 20,
        "final": 48.0,
        "confidence": "medium",
        "proponent_disclosed": true,
        "_paid_tier_note": "Per-component breakdown + math chain available in paid operator console."
      },
      "gen_set": {
        "applicable": true,
        "project_class": "mining",
        "backup_units": 0,
        "backup_mw_total": 0,
        "backup_value_usd_m": [
          0.0,
          0.0
        ],
        "btm_prime": false,
        "btm_total_mw": null,
        "btm_unit_count": 0,
        "in_service_date": null,
        "procurement_window": null,
        "confidence": "low",
        "_paid_tier_note": "Per-unit equipment class, operator-practice citations, and methodology trail available in paid operator console."
      }
    },
    {
      "id": 2014,
      "source": "SEED",
      "source_id": "278_alberta_vale_btc",
      "name": "Vale Stranded-Gas Bitcoin Mine",
      "province": "AB",
      "proponent": "2783294 Alberta Ltd.",
      "municipality": "Cypress County (Vale area)",
      "sector": "Industrial",
      "stage": "Pre-construction",
      "mw_mpi": 9.8,
      "estimated_cost_millions": null,
      "schedule": "Cypress County DP 26/39 issued Apr 2026; AUC application filed Apr 2026",
      "registry_url": "https://www.auc.ab.ca/regulatory_documents/current-applications/",
      "mw_dc_load": null,
      "mw_btm_gen": null,
      "mw_canonical": 9,
      "aeso_total_dts_mw": null,
      "aeso_allocations": [],
      "auc_filings": [
        {
          "application": "30750-A001",
          "applicant": "2783294 Alberta Ltd.",
          "description": "Vale 9.798MW Gas-fired Power Plant & Bitcoin Mine",
          "date": "2026-04-13",
          "url": "https://efiling-webapi.auc.ab.ca/Proceeding/Search?proceeding=30750"
        }
      ],
      "news_signals": [],
      "municipal_permits": [
        {
          "muni_source": "MUNI_CYPRESS",
          "permit_number": "26/39",
          "permit_type": "Development Permit",
          "address": "Plan 664LK Block OT (2515 Twp Rd 144)",
          "description": "Placement of Gas Generator, Fuel Gas Skid & Bitcoin Miner with a setback relaxation of 3.",
          "applicant": null,
          "date": "2026-04-28",
          "url": "https://cypress.ab.ca/p/notices"
        }
      ],
      "score": {
        "rank": 20,
        "final": 48.0,
        "confidence": "medium",
        "proponent_disclosed": true,
        "_paid_tier_note": "Per-component breakdown + math chain available in paid operator console."
      },
      "gen_set": {
        "applicable": true,
        "project_class": "mining",
        "backup_units": 0,
        "backup_mw_total": 0,
        "backup_value_usd_m": [
          0.0,
          0.0
        ],
        "btm_prime": false,
        "btm_total_mw": null,
        "btm_unit_count": 0,
        "in_service_date": null,
        "procurement_window": null,
        "confidence": "low",
        "_paid_tier_note": "Per-unit equipment class, operator-practice citations, and methodology trail available in paid operator console."
      }
    },
    {
      "id": 2015,
      "source": "SEED",
      "source_id": "fire_tech_btc",
      "name": "Fire Technology Bitcoin Mine",
      "province": "AB",
      "proponent": "Fire Technology Corp",
      "municipality": "Alberta (location not yet disclosed)",
      "sector": "Industrial",
      "stage": "Pre-construction",
      "mw_mpi": 9.5,
      "estimated_cost_millions": null,
      "schedule": "AUC time extension application — under review",
      "registry_url": "https://www.auc.ab.ca/regulatory_documents/current-applications/",
      "mw_dc_load": null,
      "mw_btm_gen": null,
      "mw_canonical": 9,
      "aeso_total_dts_mw": null,
      "aeso_allocations": [],
      "auc_filings": [
        {
          "application": "30730-A001",
          "applicant": "Fire Technology Corp",
          "description": "A Time Extension Application for 9.5 MW power generating facility supplying electricity to a bitcoin mining facility",
          "date": "2026-04-06",
          "url": "https://efiling-webapi.auc.ab.ca/Proceeding/Search?proceeding=30730"
        }
      ],
      "news_signals": [],
      "municipal_permits": [],
      "score": {
        "rank": 20,
        "final": 48.0,
        "confidence": "medium",
        "proponent_disclosed": true,
        "_paid_tier_note": "Per-component breakdown + math chain available in paid operator console."
      },
      "gen_set": {
        "applicable": true,
        "project_class": "mining",
        "backup_units": 0,
        "backup_mw_total": 0,
        "backup_value_usd_m": [
          0.0,
          0.0
        ],
        "btm_prime": false,
        "btm_total_mw": null,
        "btm_unit_count": 0,
        "in_service_date": null,
        "procurement_window": null,
        "confidence": "low",
        "_paid_tier_note": "Per-unit equipment class, operator-practice citations, and methodology trail available in paid operator console."
      }
    },
    {
      "id": 1983,
      "source": "SEED",
      "source_id": "uniserve_vancouver",
      "name": "Uniserve Vancouver Data Centre",
      "province": "BC",
      "proponent": "Uniserve Communications",
      "municipality": "Vancouver",
      "sector": "Industrial",
      "stage": "Pre-construction",
      "mw_mpi": 2.0,
      "estimated_cost_millions": null,
      "schedule": null,
      "registry_url": "https://baxtel.com/data-center/british-columbia",
      "mw_dc_load": null,
      "mw_btm_gen": null,
      "mw_canonical": 2,
      "aeso_total_dts_mw": null,
      "aeso_allocations": [],
      "auc_filings": [],
      "news_signals": [],
      "municipal_permits": [],
      "score": {
        "rank": 25,
        "final": 45.0,
        "confidence": "low",
        "proponent_disclosed": true,
        "_paid_tier_note": "Per-component breakdown + math chain available in paid operator console."
      },
      "gen_set": {
        "applicable": true,
        "project_class": "edge_micro",
        "backup_units": 2,
        "backup_mw_total": 2,
        "backup_value_usd_m": [
          1.0,
          1.6
        ],
        "btm_prime": false,
        "btm_total_mw": null,
        "btm_unit_count": 0,
        "in_service_date": null,
        "procurement_window": null,
        "confidence": "low",
        "_paid_tier_note": "Per-unit equipment class, operator-practice citations, and methodology trail available in paid operator console."
      }
    },
    {
      "id": 1967,
      "source": "AB_MPI",
      "source_id": "12097",
      "name": "Mihta Askiy Data Centre",
      "province": "AB",
      "proponent": "Mihta Askiy Datacenter LP",
      "municipality": "Northern Sunrise County",
      "sector": "Industrial",
      "stage": "Proposed",
      "mw_mpi": null,
      "estimated_cost_millions": null,
      "schedule": "Commencing 2027",
      "registry_url": "https://majorprojects.alberta.caThis project entails acquiring a partially completed power plant to convert into a natural gas-powered data centre. The Mihta Askiy Data Centre is located 500 kilometres northwest of Edmonton, and 40 kilometers northeast of Peace River. Mihta Askiy Datacenter LP will oversee the development of a 650 MW facility. The data centre plan is led by Cree Ative Datacenter Corp GP, a wholly owned subsidiary of Sovereign Digital Infrastructure, a Canadian based Datacenter/Power System developer focused on partnerships with local First Nations near the projects they are pursuing to develop. Location on the map is not exact.",
      "mw_dc_load": 300,
      "mw_btm_gen": null,
      "mw_canonical": 300,
      "aeso_total_dts_mw": 300,
      "aeso_allocations": [
        {
          "proj_no": "P3110",
          "name": "Mihta Askiy Data Load",
          "mw_type": "Data Load",
          "fuel_type": "No Supply",
          "mw_dts": 300,
          "mw_sts": 0,
          "mw": 300,
          "in_service_date": null,
          "status": "ISD Under Review",
          "stage": 1
        }
      ],
      "auc_filings": [
        {
          "application": "30787-A002",
          "applicant": "Cree Ative Datacenter GP",
          "description": "Mihta Askiy Data Center Power Plant Project",
          "date": "2026-05-04",
          "url": "https://efiling-webapi.auc.ab.ca/Proceeding/Search?proceeding=30787"
        }
      ],
      "news_signals": [],
      "municipal_permits": [],
      "score": {
        "rank": 26,
        "final": 41.9,
        "confidence": "high",
        "proponent_disclosed": true,
        "_paid_tier_note": "Per-component breakdown + math chain available in paid operator console."
      },
      "gen_set": {
        "applicable": true,
        "project_class": "hyperscale_ai",
        "backup_units": 138,
        "backup_mw_total": 345,
        "backup_value_usd_m": [
          138.0,
          241.5
        ],
        "btm_prime": false,
        "btm_total_mw": null,
        "btm_unit_count": 0,
        "in_service_date": null,
        "procurement_window": null,
        "confidence": "low",
        "_paid_tier_note": "Per-unit equipment class, operator-practice citations, and methodology trail available in paid operator console."
      }
    },
    {
      "id": 1438,
      "source": "AB_MPI",
      "source_id": "11492",
      "name": "Beacon Langdon Artificial Intelligence Hub",
      "province": "AB",
      "proponent": "Beacon Data Centers",
      "municipality": "Rocky View County",
      "sector": "Industrial",
      "stage": "Proposed",
      "mw_mpi": null,
      "estimated_cost_millions": null,
      "schedule": null,
      "registry_url": "https://majorprojects.alberta.caThe proponent is proposing to build a new data center known as the Beacon Langdon Artificial Intelligence Hub. The facility will contain 400 MW on onsite power generation capacity, along with other on-site data center facilities. Approvals are still being sought.� Location on map is not precise. Location is between Calgary and Langdon.�",
      "mw_dc_load": 1800,
      "mw_btm_gen": null,
      "mw_canonical": 1800,
      "aeso_total_dts_mw": 1800,
      "aeso_allocations": [
        {
          "proj_no": "P2970",
          "name": "Beacon Langdon A.I. Hub 2 Load",
          "mw_type": "Data Load",
          "fuel_type": "No Supply",
          "mw_dts": 1400,
          "mw_sts": 0,
          "mw": 1400,
          "in_service_date": null,
          "status": "ISD Under Review",
          "stage": 1
        },
        {
          "proj_no": "P2928",
          "name": "Beacon Langdon A.I. Hub Load",
          "mw_type": "Data Load",
          "fuel_type": "No Supply",
          "mw_dts": 400,
          "mw_sts": 0,
          "mw": 400,
          "in_service_date": null,
          "status": "ISD Under Review",
          "stage": 2
        }
      ],
      "auc_filings": [],
      "news_signals": [],
      "municipal_permits": [],
      "score": {
        "rank": 27,
        "final": 40.7,
        "confidence": "medium",
        "proponent_disclosed": true,
        "_paid_tier_note": "Per-component breakdown + math chain available in paid operator console."
      },
      "gen_set": {
        "applicable": true,
        "project_class": "hyperscale_ai",
        "backup_units": 827,
        "backup_mw_total": 2068,
        "backup_value_usd_m": [
          827.2,
          1447.6
        ],
        "btm_prime": false,
        "btm_total_mw": null,
        "btm_unit_count": 0,
        "in_service_date": null,
        "procurement_window": null,
        "confidence": "low",
        "_paid_tier_note": "Per-unit equipment class, operator-practice citations, and methodology trail available in paid operator console."
      }
    },
    {
      "id": 1709,
      "source": "AB_MPI",
      "source_id": "11820",
      "name": "Prairie Sky Data Solutions Strathmore Data Center (Phase 1)",
      "province": "AB",
      "proponent": "Prairie Sky Data Solutions",
      "municipality": "Strathmore",
      "sector": "Industrial",
      "stage": "Proposed",
      "mw_mpi": null,
      "estimated_cost_millions": null,
      "schedule": "Completion by 2026",
      "registry_url": "https://www.prairieskydata.com/",
      "mw_dc_load": null,
      "mw_btm_gen": null,
      "mw_canonical": null,
      "aeso_total_dts_mw": null,
      "aeso_allocations": [],
      "auc_filings": [],
      "news_signals": [],
      "municipal_permits": [],
      "score": {
        "rank": 28,
        "final": 39.5,
        "confidence": "low",
        "proponent_disclosed": true,
        "_paid_tier_note": "Per-component breakdown + math chain available in paid operator console."
      },
      "gen_set": {
        "applicable": false,
        "reason": "no_load_mw_and_no_thermal_gen",
        "project_class": "hyperscale_ai"
      }
    },
    {
      "id": 1939,
      "source": "AB_MPI",
      "source_id": "12068",
      "name": "Data Center (Clive)",
      "province": "AB",
      "proponent": "VL Energy and Amada Nowlitt Energy",
      "municipality": "Lacombe County",
      "sector": "Industrial",
      "stage": "Proposed",
      "mw_mpi": null,
      "estimated_cost_millions": null,
      "schedule": "Commencing 2026",
      "registry_url": "https://majorprojects.alberta.caA new data center on a 4.3-acre site off Haynes road, west of Clive is being proposed for approval. This facility will have a 19.8-megawatt natural gas-fired power generation capacity and will also be configured to use biofuels. The data center will power modular data processing containers that can be used for processing artificial intelligence, cryptocurrencies and other processes requiring high computer power.� Location on the map is not exact.",
      "mw_dc_load": null,
      "mw_btm_gen": null,
      "mw_canonical": null,
      "aeso_total_dts_mw": null,
      "aeso_allocations": [],
      "auc_filings": [],
      "news_signals": [],
      "municipal_permits": [],
      "score": {
        "rank": 28,
        "final": 39.5,
        "confidence": "low",
        "proponent_disclosed": true,
        "_paid_tier_note": "Per-component breakdown + math chain available in paid operator console."
      },
      "gen_set": {
        "applicable": false,
        "reason": "no_load_mw_and_no_thermal_gen",
        "project_class": "hyperscale_ai"
      }
    },
    {
      "id": 1437,
      "source": "AB_MPI",
      "source_id": "11491",
      "name": "Beacon Hary Smith Artificial Intelligence Hub",
      "province": "AB",
      "proponent": "Beacon Data Centers",
      "municipality": "Parkland County",
      "sector": "Industrial",
      "stage": "Proposed",
      "mw_mpi": null,
      "estimated_cost_millions": null,
      "schedule": null,
      "registry_url": "https://majorprojects.alberta.caThe proponent is proposing to build a new data center known as the Beacon Hary Smith Artificial Intelligence Hub. The facility will contain 400 MW on onsite power generation capacity, along with other on-site data center facilities. Approvals are still being sought.� Location on map is not precise.�",
      "mw_dc_load": 400,
      "mw_btm_gen": null,
      "mw_canonical": 400,
      "aeso_total_dts_mw": 400,
      "aeso_allocations": [
        {
          "proj_no": "P2927",
          "name": "Beacon Harry Smith A.I. Hub Load",
          "mw_type": "Data Load",
          "fuel_type": "No Supply",
          "mw_dts": 400,
          "mw_sts": 0,
          "mw": 400,
          "in_service_date": null,
          "status": "ISD Under Review",
          "stage": 2
        }
      ],
      "auc_filings": [],
      "news_signals": [],
      "municipal_permits": [],
      "score": {
        "rank": 30,
        "final": 37.7,
        "confidence": "medium",
        "proponent_disclosed": true,
        "_paid_tier_note": "Per-component breakdown + math chain available in paid operator console."
      },
      "gen_set": {
        "applicable": true,
        "project_class": "hyperscale_ai",
        "backup_units": 184,
        "backup_mw_total": 460,
        "backup_value_usd_m": [
          184.0,
          322.0
        ],
        "btm_prime": false,
        "btm_total_mw": null,
        "btm_unit_count": 0,
        "in_service_date": null,
        "procurement_window": null,
        "confidence": "low",
        "_paid_tier_note": "Per-unit equipment class, operator-practice citations, and methodology trail available in paid operator console."
      }
    },
    {
      "id": 1439,
      "source": "AB_MPI",
      "source_id": "11493",
      "name": "Beacon Heartland Artificial Intelligence Hub",
      "province": "AB",
      "proponent": "Beacon Data Centers",
      "municipality": "Strathcona County",
      "sector": "Industrial",
      "stage": "Proposed",
      "mw_mpi": null,
      "estimated_cost_millions": null,
      "schedule": null,
      "registry_url": "https://majorprojects.alberta.caThe proponent is proposing to build a new data center known as the Beacon Heartland Artificial Intelligence Hub. The facility will contain 400 MW on onsite power generation capacity, along with other on-site data center facilities. Approvals are still being sought. Location on map is not precise.�",
      "mw_dc_load": 400,
      "mw_btm_gen": null,
      "mw_canonical": 400,
      "aeso_total_dts_mw": 400,
      "aeso_allocations": [
        {
          "proj_no": "P2934",
          "name": "Beacon Heartland A.I. Hub Load",
          "mw_type": "Data Load",
          "fuel_type": "No Supply",
          "mw_dts": 400,
          "mw_sts": 0,
          "mw": 400,
          "in_service_date": null,
          "status": "ISD Under Review",
          "stage": 2
        }
      ],
      "auc_filings": [],
      "news_signals": [],
      "municipal_permits": [],
      "score": {
        "rank": 30,
        "final": 37.7,
        "confidence": "medium",
        "proponent_disclosed": true,
        "_paid_tier_note": "Per-component breakdown + math chain available in paid operator console."
      },
      "gen_set": {
        "applicable": true,
        "project_class": "hyperscale_ai",
        "backup_units": 184,
        "backup_mw_total": 460,
        "backup_value_usd_m": [
          184.0,
          322.0
        ],
        "btm_prime": false,
        "btm_total_mw": null,
        "btm_unit_count": 0,
        "in_service_date": null,
        "procurement_window": null,
        "confidence": "low",
        "_paid_tier_note": "Per-unit equipment class, operator-practice citations, and methodology trail available in paid operator console."
      }
    },
    {
      "id": 1440,
      "source": "AB_MPI",
      "source_id": "11494",
      "name": "Beacon Saunders Lake Artificial Intelligence Hub",
      "province": "AB",
      "proponent": "Beacon Data Centers",
      "municipality": "Leduc County",
      "sector": "Industrial",
      "stage": "Proposed",
      "mw_mpi": null,
      "estimated_cost_millions": null,
      "schedule": null,
      "registry_url": "https://majorprojects.alberta.caThe proponent is proposing to build a new data center known as the Beacon Saunders Lake Artificial Intelligence Hub. The facility will contain 400 MW on onsite power generation capacity, along with other on-site data center facilities. Approvals are still being sought. Location on map is not precise.�",
      "mw_dc_load": 400,
      "mw_btm_gen": null,
      "mw_canonical": 400,
      "aeso_total_dts_mw": 400,
      "aeso_allocations": [
        {
          "proj_no": "P2935",
          "name": "Beacon Saunders Lake A.I. Hub Load",
          "mw_type": "Data Load",
          "fuel_type": "No Supply",
          "mw_dts": 400,
          "mw_sts": 0,
          "mw": 400,
          "in_service_date": null,
          "status": "ISD Under Review",
          "stage": 2
        }
      ],
      "auc_filings": [],
      "news_signals": [],
      "municipal_permits": [],
      "score": {
        "rank": 30,
        "final": 37.7,
        "confidence": "medium",
        "proponent_disclosed": true,
        "_paid_tier_note": "Per-component breakdown + math chain available in paid operator console."
      },
      "gen_set": {
        "applicable": true,
        "project_class": "hyperscale_ai",
        "backup_units": 184,
        "backup_mw_total": 460,
        "backup_value_usd_m": [
          184.0,
          322.0
        ],
        "btm_prime": false,
        "btm_total_mw": null,
        "btm_unit_count": 0,
        "in_service_date": null,
        "procurement_window": null,
        "confidence": "low",
        "_paid_tier_note": "Per-unit equipment class, operator-practice citations, and methodology trail available in paid operator console."
      }
    },
    {
      "id": 2002,
      "source": "AESO_SYNTHETIC",
      "source_id": "P3137",
      "name": "Sheerness Data Centre",
      "province": "AB",
      "proponent": "TransAlta Corporation (inferred from AUC filing)",
      "municipality": "Sheerness area",
      "sector": "Industrial",
      "stage": "Pre-construction",
      "mw_mpi": 800.0,
      "estimated_cost_millions": null,
      "schedule": null,
      "registry_url": null,
      "mw_dc_load": 800,
      "mw_btm_gen": null,
      "mw_canonical": 800,
      "aeso_total_dts_mw": 800,
      "aeso_allocations": [
        {
          "proj_no": "P3137",
          "name": "Sheerness Data Load",
          "mw_type": "Data Load",
          "fuel_type": "No Supply",
          "mw_dts": 800,
          "mw_sts": 0,
          "mw": 800,
          "in_service_date": null,
          "status": "ISD Under Review",
          "stage": 1
        }
      ],
      "auc_filings": [
        {
          "application": "30742-A001",
          "applicant": "TransAlta Corporation^TransAlta Cogeneration Ltd.^Transalta Generation Partnership",
          "description": "TransAlta Corporation, TransAlta Generation Partnership, TransAlta Cogeneration Ltd. and CPH Cogen Inc. Preferential Sharing of Records material change notice for Sheerness",
          "date": "2026-04-09",
          "url": "https://efiling-webapi.auc.ab.ca/Proceeding/Search?proceeding=30742"
        }
      ],
      "news_signals": [],
      "municipal_permits": [],
      "score": {
        "rank": 33,
        "final": 36.65,
        "confidence": "high",
        "proponent_disclosed": true,
        "_paid_tier_note": "Per-component breakdown + math chain available in paid operator console."
      },
      "gen_set": {
        "applicable": true,
        "project_class": "hyperscale_ai",
        "backup_units": 368,
        "backup_mw_total": 920,
        "backup_value_usd_m": [
          368.0,
          644.0
        ],
        "btm_prime": false,
        "btm_total_mw": null,
        "btm_unit_count": 0,
        "in_service_date": null,
        "procurement_window": null,
        "confidence": "medium",
        "_paid_tier_note": "Per-unit equipment class, operator-practice citations, and methodology trail available in paid operator console."
      }
    },
    {
      "id": 1984,
      "source": "SEED",
      "source_id": "bc_hydro_2026_cfd",
      "name": "BC Hydro 2026 Call for Demand — AI/Data Centre Allocations",
      "province": "BC",
      "proponent": "Multiple — TBD post Sept 2026",
      "municipality": "Province-wide",
      "sector": "Power",
      "stage": "Announced",
      "mw_mpi": 400.0,
      "estimated_cost_millions": null,
      "schedule": "Application period Jan 2026; awards Sept 2026",
      "registry_url": "https://app.bchydro.com/accounts-billing/electrical-connections/large-load/emerging-industries-connections.html",
      "mw_dc_load": null,
      "mw_btm_gen": null,
      "mw_canonical": 400,
      "aeso_total_dts_mw": null,
      "aeso_allocations": [],
      "auc_filings": [],
      "news_signals": [],
      "municipal_permits": [],
      "score": {
        "rank": 34,
        "final": 27.5,
        "confidence": "low",
        "proponent_disclosed": true,
        "_paid_tier_note": "Per-component breakdown + math chain available in paid operator console."
      },
      "gen_set": {
        "applicable": false,
        "reason": "allocation_placeholder",
        "project_class": "allocation_placeholder"
      }
    },
    {
      "id": 2003,
      "source": "AESO_SYNTHETIC",
      "source_id": "P3141",
      "name": "Opal Data Centre",
      "province": "AB",
      "proponent": "Undisclosed",
      "municipality": "Fox Creek area",
      "sector": "Industrial",
      "stage": "Pre-construction",
      "mw_mpi": 0.0,
      "estimated_cost_millions": null,
      "schedule": "In-service 2027-02-11",
      "registry_url": null,
      "mw_dc_load": null,
      "mw_btm_gen": 98,
      "mw_canonical": null,
      "aeso_total_dts_mw": null,
      "aeso_allocations": [
        {
          "proj_no": "P2456",
          "name": "Opal Gas",
          "mw_type": "Gas",
          "fuel_type": "Gas",
          "mw_dts": 0,
          "mw_sts": 98,
          "mw": 0,
          "in_service_date": "2027-07-30",
          "status": "Active",
          "stage": 5
        },
        {
          "proj_no": "P3141",
          "name": "Opal Data Load",
          "mw_type": "Data Load",
          "fuel_type": "No Supply",
          "mw_dts": 0,
          "mw_sts": 0,
          "mw": 0,
          "in_service_date": "2027-02-11",
          "status": "Active",
          "stage": 1
        }
      ],
      "auc_filings": [],
      "news_signals": [],
      "municipal_permits": [],
      "score": {
        "rank": 35,
        "final": 20.75,
        "confidence": "low",
        "proponent_disclosed": false,
        "_paid_tier_note": "Per-component breakdown + math chain available in paid operator console."
      },
      "gen_set": {
        "applicable": true,
        "project_class": "hyperscale_ai",
        "backup_units": 0,
        "backup_mw_total": 0,
        "backup_value_usd_m": [
          0.0,
          0.0
        ],
        "btm_prime": true,
        "btm_total_mw": 98,
        "btm_unit_count": 1,
        "in_service_date": "2027-02-11",
        "procurement_window": [
          "2025-02",
          "2025-08"
        ],
        "confidence": "high",
        "_paid_tier_note": "Per-unit equipment class, operator-practice citations, and methodology trail available in paid operator console."
      }
    },
    {
      "id": 1989,
      "source": "AESO_SYNTHETIC",
      "source_id": "P3075",
      "name": "Balzac Area Data Centre",
      "province": "AB",
      "proponent": "Undisclosed",
      "municipality": "Calgary area",
      "sector": "Industrial",
      "stage": "Pre-construction",
      "mw_mpi": 45.0,
      "estimated_cost_millions": null,
      "schedule": "In-service 2026-12-01",
      "registry_url": null,
      "mw_dc_load": 45,
      "mw_btm_gen": null,
      "mw_canonical": 45,
      "aeso_total_dts_mw": 45,
      "aeso_allocations": [
        {
          "proj_no": "P3075",
          "name": "Balzac Area Load",
          "mw_type": "Data Load",
          "fuel_type": "No Supply",
          "mw_dts": 45,
          "mw_sts": 0,
          "mw": 45,
          "in_service_date": "2026-12-01",
          "status": "Active",
          "stage": 2
        }
      ],
      "auc_filings": [],
      "news_signals": [],
      "municipal_permits": [],
      "score": {
        "rank": 36,
        "final": 18.05,
        "confidence": "low",
        "proponent_disclosed": false,
        "_paid_tier_note": "Per-component breakdown + math chain available in paid operator console."
      },
      "gen_set": {
        "applicable": true,
        "project_class": "hyperscale_ai",
        "backup_units": 20,
        "backup_mw_total": 50,
        "backup_value_usd_m": [
          20.0,
          35.0
        ],
        "btm_prime": false,
        "btm_total_mw": null,
        "btm_unit_count": 0,
        "in_service_date": "2026-12-01",
        "procurement_window": [
          "2024-12",
          "2025-06"
        ],
        "confidence": "low",
        "_paid_tier_note": "Per-unit equipment class, operator-practice citations, and methodology trail available in paid operator console."
      }
    },
    {
      "id": 2008,
      "source": "AESO_SYNTHETIC",
      "source_id": "P2952",
      "name": "North Calgary One Data Centre",
      "province": "AB",
      "proponent": "Undisclosed",
      "municipality": "Calgary area",
      "sector": "Industrial",
      "stage": "Pre-construction",
      "mw_mpi": 74.9,
      "estimated_cost_millions": null,
      "schedule": "In-service 2027-03-26",
      "registry_url": null,
      "mw_dc_load": 74,
      "mw_btm_gen": null,
      "mw_canonical": 74,
      "aeso_total_dts_mw": 74,
      "aeso_allocations": [
        {
          "proj_no": "P2952",
          "name": "North Calgary One Data Centre MPC Load",
          "mw_type": "Data Load",
          "fuel_type": "No Supply",
          "mw_dts": 74,
          "mw_sts": 0,
          "mw": 74,
          "in_service_date": "2027-03-26",
          "status": "Active",
          "stage": 2
        }
      ],
      "auc_filings": [],
      "news_signals": [],
      "municipal_permits": [],
      "score": {
        "rank": 36,
        "final": 18.05,
        "confidence": "low",
        "proponent_disclosed": false,
        "_paid_tier_note": "Per-component breakdown + math chain available in paid operator console."
      },
      "gen_set": {
        "applicable": true,
        "project_class": "hyperscale_ai",
        "backup_units": 34,
        "backup_mw_total": 85,
        "backup_value_usd_m": [
          34.0,
          59.5
        ],
        "btm_prime": false,
        "btm_total_mw": null,
        "btm_unit_count": 0,
        "in_service_date": "2027-03-26",
        "procurement_window": [
          "2025-03",
          "2025-09"
        ],
        "confidence": "low",
        "_paid_tier_note": "Per-unit equipment class, operator-practice citations, and methodology trail available in paid operator console."
      }
    },
    {
      "id": 2009,
      "source": "AESO_SYNTHETIC",
      "source_id": "P2953",
      "name": "North Calgary Two Data Centre",
      "province": "AB",
      "proponent": "Undisclosed",
      "municipality": "Calgary area",
      "sector": "Industrial",
      "stage": "Pre-construction",
      "mw_mpi": 74.9,
      "estimated_cost_millions": null,
      "schedule": "In-service 2027-03-26",
      "registry_url": null,
      "mw_dc_load": 74,
      "mw_btm_gen": null,
      "mw_canonical": 74,
      "aeso_total_dts_mw": 74,
      "aeso_allocations": [
        {
          "proj_no": "P2953",
          "name": "North Calgary Two Data Centre MPC Load",
          "mw_type": "Data Load",
          "fuel_type": "No Supply",
          "mw_dts": 74,
          "mw_sts": 0,
          "mw": 74,
          "in_service_date": "2027-03-26",
          "status": "Active",
          "stage": 2
        }
      ],
      "auc_filings": [],
      "news_signals": [],
      "municipal_permits": [],
      "score": {
        "rank": 36,
        "final": 18.05,
        "confidence": "low",
        "proponent_disclosed": false,
        "_paid_tier_note": "Per-component breakdown + math chain available in paid operator console."
      },
      "gen_set": {
        "applicable": true,
        "project_class": "hyperscale_ai",
        "backup_units": 34,
        "backup_mw_total": 85,
        "backup_value_usd_m": [
          34.0,
          59.5
        ],
        "btm_prime": false,
        "btm_total_mw": null,
        "btm_unit_count": 0,
        "in_service_date": "2027-03-26",
        "procurement_window": [
          "2025-03",
          "2025-09"
        ],
        "confidence": "low",
        "_paid_tier_note": "Per-unit equipment class, operator-practice citations, and methodology trail available in paid operator console."
      }
    },
    {
      "id": 2006,
      "source": "AESO_SYNTHETIC",
      "source_id": "P3157",
      "name": "Clearwater Technology Park",
      "province": "AB",
      "proponent": "Undisclosed",
      "municipality": "Calgary area",
      "sector": "Industrial",
      "stage": "Pre-construction",
      "mw_mpi": 74.9,
      "estimated_cost_millions": null,
      "schedule": "In-service 2027-10-01",
      "registry_url": null,
      "mw_dc_load": 74,
      "mw_btm_gen": 15,
      "mw_canonical": 74,
      "aeso_total_dts_mw": 74,
      "aeso_allocations": [
        {
          "proj_no": "P3157",
          "name": "Clearwater Technology Park Data Load",
          "mw_type": "Data Load",
          "fuel_type": "No Supply",
          "mw_dts": 74,
          "mw_sts": 0,
          "mw": 74,
          "in_service_date": "2027-10-01",
          "status": "Active",
          "stage": 1
        },
        {
          "proj_no": "P2967",
          "name": "Clearwater Facility Cogen",
          "mw_type": "Cogen",
          "fuel_type": "Gas",
          "mw_dts": 35,
          "mw_sts": 15,
          "mw": 35,
          "in_service_date": "2029-07-01",
          "status": "Active",
          "stage": 3
        }
      ],
      "auc_filings": [],
      "news_signals": [],
      "municipal_permits": [],
      "score": {
        "rank": 39,
        "final": 17.95,
        "confidence": "low",
        "proponent_disclosed": false,
        "_paid_tier_note": "Per-component breakdown + math chain available in paid operator console."
      },
      "gen_set": {
        "applicable": true,
        "project_class": "hyperscale_ai",
        "backup_units": 34,
        "backup_mw_total": 85,
        "backup_value_usd_m": [
          34.0,
          59.5
        ],
        "btm_prime": true,
        "btm_total_mw": 15,
        "btm_unit_count": 1,
        "in_service_date": "2027-10-01",
        "procurement_window": [
          "2025-10",
          "2026-04"
        ],
        "confidence": "high",
        "_paid_tier_note": "Per-unit equipment class, operator-practice citations, and methodology trail available in paid operator console."
      }
    },
    {
      "id": 2001,
      "source": "AESO_SYNTHETIC",
      "source_id": "P3126",
      "name": "Sollair Data Centre",
      "province": "AB",
      "proponent": "Undisclosed",
      "municipality": "Airdrie area",
      "sector": "Industrial",
      "stage": "Pre-construction",
      "mw_mpi": 74.4,
      "estimated_cost_millions": null,
      "schedule": "In-service 2027-12-10",
      "registry_url": null,
      "mw_dc_load": 74,
      "mw_btm_gen": null,
      "mw_canonical": 74,
      "aeso_total_dts_mw": 74,
      "aeso_allocations": [
        {
          "proj_no": "P3126",
          "name": "Sollair Load",
          "mw_type": "Data Load",
          "fuel_type": "No Supply",
          "mw_dts": 74,
          "mw_sts": 0,
          "mw": 74,
          "in_service_date": "2027-12-10",
          "status": "Active",
          "stage": 1
        }
      ],
      "auc_filings": [],
      "news_signals": [],
      "municipal_permits": [],
      "score": {
        "rank": 40,
        "final": 17.65,
        "confidence": "low",
        "proponent_disclosed": false,
        "_paid_tier_note": "Per-component breakdown + math chain available in paid operator console."
      },
      "gen_set": {
        "applicable": true,
        "project_class": "hyperscale_ai",
        "backup_units": 34,
        "backup_mw_total": 85,
        "backup_value_usd_m": [
          34.0,
          59.5
        ],
        "btm_prime": false,
        "btm_total_mw": null,
        "btm_unit_count": 0,
        "in_service_date": "2027-12-10",
        "procurement_window": [
          "2025-12",
          "2026-06"
        ],
        "confidence": "low",
        "_paid_tier_note": "Per-unit equipment class, operator-practice citations, and methodology trail available in paid operator console."
      }
    },
    {
      "id": 2007,
      "source": "AESO_SYNTHETIC",
      "source_id": "P3174",
      "name": "Sovereign Cloud Data Centre",
      "province": "AB",
      "proponent": "Undisclosed",
      "municipality": "Edmonton area",
      "sector": "Industrial",
      "stage": "Pre-construction",
      "mw_mpi": 74.9,
      "estimated_cost_millions": null,
      "schedule": "In-service 2029-12-31",
      "registry_url": null,
      "mw_dc_load": 74,
      "mw_btm_gen": null,
      "mw_canonical": 74,
      "aeso_total_dts_mw": 74,
      "aeso_allocations": [
        {
          "proj_no": "P3174",
          "name": "Sovereign Cloud Data Load",
          "mw_type": "Data Load",
          "fuel_type": "No Supply",
          "mw_dts": 74,
          "mw_sts": 0,
          "mw": 74,
          "in_service_date": "2029-12-31",
          "status": "Active",
          "stage": 1
        }
      ],
      "auc_filings": [],
      "news_signals": [],
      "municipal_permits": [],
      "score": {
        "rank": 41,
        "final": 16.9,
        "confidence": "low",
        "proponent_disclosed": false,
        "_paid_tier_note": "Per-component breakdown + math chain available in paid operator console."
      },
      "gen_set": {
        "applicable": true,
        "project_class": "hyperscale_ai",
        "backup_units": 34,
        "backup_mw_total": 85,
        "backup_value_usd_m": [
          34.0,
          59.5
        ],
        "btm_prime": false,
        "btm_total_mw": null,
        "btm_unit_count": 0,
        "in_service_date": "2029-12-31",
        "procurement_window": [
          "2027-12",
          "2028-06"
        ],
        "confidence": "low",
        "_paid_tier_note": "Per-unit equipment class, operator-practice citations, and methodology trail available in paid operator console."
      }
    },
    {
      "id": 1988,
      "source": "AESO_SYNTHETIC",
      "source_id": "P3066",
      "name": "Leedale Data Centre",
      "province": "AB",
      "proponent": "Undisclosed",
      "municipality": "Caroline area",
      "sector": "Industrial",
      "stage": "Pre-construction",
      "mw_mpi": 1864.0,
      "estimated_cost_millions": null,
      "schedule": null,
      "registry_url": null,
      "mw_dc_load": 1864,
      "mw_btm_gen": null,
      "mw_canonical": 1864,
      "aeso_total_dts_mw": 1864,
      "aeso_allocations": [
        {
          "proj_no": "P3066",
          "name": "Leedale Data Load",
          "mw_type": "Data Load",
          "fuel_type": "No Supply",
          "mw_dts": 1864,
          "mw_sts": 0,
          "mw": 1864,
          "in_service_date": null,
          "status": "ISD Under Review",
          "stage": 2
        }
      ],
      "auc_filings": [],
      "news_signals": [],
      "municipal_permits": [],
      "score": {
        "rank": 42,
        "final": 12.12,
        "confidence": "low",
        "proponent_disclosed": false,
        "_paid_tier_note": "Per-component breakdown + math chain available in paid operator console."
      },
      "gen_set": {
        "applicable": true,
        "project_class": "hyperscale_ai",
        "backup_units": 857,
        "backup_mw_total": 2142,
        "backup_value_usd_m": [
          856.8,
          1499.4
        ],
        "btm_prime": false,
        "btm_total_mw": null,
        "btm_unit_count": 0,
        "in_service_date": null,
        "procurement_window": null,
        "confidence": "low",
        "_paid_tier_note": "Per-unit equipment class, operator-practice citations, and methodology trail available in paid operator console."
      }
    },
    {
      "id": 1994,
      "source": "AESO_SYNTHETIC",
      "source_id": "P3108",
      "name": "Wild Rose Power Hub",
      "province": "AB",
      "proponent": "Undisclosed",
      "municipality": "Calgary area",
      "sector": "Industrial",
      "stage": "Pre-construction",
      "mw_mpi": 1300.0,
      "estimated_cost_millions": null,
      "schedule": null,
      "registry_url": null,
      "mw_dc_load": 1300,
      "mw_btm_gen": null,
      "mw_canonical": 1300,
      "aeso_total_dts_mw": 1300,
      "aeso_allocations": [
        {
          "proj_no": "P3108",
          "name": "Wild Rose Power Hub Load",
          "mw_type": "Data Load",
          "fuel_type": "No Supply",
          "mw_dts": 1300,
          "mw_sts": 0,
          "mw": 1300,
          "in_service_date": null,
          "status": "ISD Under Review",
          "stage": 2
        }
      ],
      "auc_filings": [],
      "news_signals": [],
      "municipal_permits": [],
      "score": {
        "rank": 43,
        "final": 11.82,
        "confidence": "low",
        "proponent_disclosed": false,
        "_paid_tier_note": "Per-component breakdown + math chain available in paid operator console."
      },
      "gen_set": {
        "applicable": true,
        "project_class": "hyperscale_ai",
        "backup_units": 598,
        "backup_mw_total": 1495,
        "backup_value_usd_m": [
          598.0,
          1046.5
        ],
        "btm_prime": false,
        "btm_total_mw": null,
        "btm_unit_count": 0,
        "in_service_date": null,
        "procurement_window": null,
        "confidence": "low",
        "_paid_tier_note": "Per-unit equipment class, operator-practice citations, and methodology trail available in paid operator console."
      }
    },
    {
      "id": 1995,
      "source": "AESO_SYNTHETIC",
      "source_id": "P3109",
      "name": "Newell Data Center",
      "province": "AB",
      "proponent": "Undisclosed",
      "municipality": "Brooks area",
      "sector": "Industrial",
      "stage": "Pre-construction",
      "mw_mpi": 1200.0,
      "estimated_cost_millions": null,
      "schedule": null,
      "registry_url": null,
      "mw_dc_load": 1200,
      "mw_btm_gen": null,
      "mw_canonical": 1200,
      "aeso_total_dts_mw": 1200,
      "aeso_allocations": [
        {
          "proj_no": "P3109",
          "name": "Newell Data Center MPC Load",
          "mw_type": "Data Load",
          "fuel_type": "No Supply",
          "mw_dts": 1200,
          "mw_sts": 0,
          "mw": 1200,
          "in_service_date": null,
          "status": "ISD Under Review",
          "stage": 2
        }
      ],
      "auc_filings": [],
      "news_signals": [],
      "municipal_permits": [],
      "score": {
        "rank": 44,
        "final": 11.68,
        "confidence": "low",
        "proponent_disclosed": false,
        "_paid_tier_note": "Per-component breakdown + math chain available in paid operator console."
      },
      "gen_set": {
        "applicable": true,
        "project_class": "hyperscale_ai",
        "backup_units": 552,
        "backup_mw_total": 1380,
        "backup_value_usd_m": [
          552.0,
          966.0
        ],
        "btm_prime": false,
        "btm_total_mw": null,
        "btm_unit_count": 0,
        "in_service_date": null,
        "procurement_window": null,
        "confidence": "low",
        "_paid_tier_note": "Per-unit equipment class, operator-practice citations, and methodology trail available in paid operator console."
      }
    },
    {
      "id": 1992,
      "source": "AESO_SYNTHETIC",
      "source_id": "P3101",
      "name": "Carstairs Technology Park",
      "province": "AB",
      "proponent": "Undisclosed",
      "municipality": "Didsbury area",
      "sector": "Industrial",
      "stage": "Pre-construction",
      "mw_mpi": 950.0,
      "estimated_cost_millions": null,
      "schedule": null,
      "registry_url": null,
      "mw_dc_load": 950,
      "mw_btm_gen": null,
      "mw_canonical": 950,
      "aeso_total_dts_mw": 950,
      "aeso_allocations": [
        {
          "proj_no": "P3101",
          "name": "Carstairs Technology Park MPC Load",
          "mw_type": "Data Load",
          "fuel_type": "No Supply",
          "mw_dts": 950,
          "mw_sts": 0,
          "mw": 950,
          "in_service_date": null,
          "status": "ISD Under Review",
          "stage": 2
        }
      ],
      "auc_filings": [],
      "news_signals": [],
      "municipal_permits": [],
      "score": {
        "rank": 45,
        "final": 11.22,
        "confidence": "low",
        "proponent_disclosed": false,
        "_paid_tier_note": "Per-component breakdown + math chain available in paid operator console."
      },
      "gen_set": {
        "applicable": true,
        "project_class": "hyperscale_ai",
        "backup_units": 436,
        "backup_mw_total": 1090,
        "backup_value_usd_m": [
          436.0,
          763.0
        ],
        "btm_prime": false,
        "btm_total_mw": null,
        "btm_unit_count": 0,
        "in_service_date": null,
        "procurement_window": null,
        "confidence": "low",
        "_paid_tier_note": "Per-unit equipment class, operator-practice citations, and methodology trail available in paid operator console."
      }
    },
    {
      "id": 1993,
      "source": "AESO_SYNTHETIC",
      "source_id": "P3102",
      "name": "Goldfinch Technology Park",
      "province": "AB",
      "proponent": "Undisclosed",
      "municipality": "Strathmore / Blackie area",
      "sector": "Industrial",
      "stage": "Pre-construction",
      "mw_mpi": 950.0,
      "estimated_cost_millions": null,
      "schedule": null,
      "registry_url": null,
      "mw_dc_load": 950,
      "mw_btm_gen": null,
      "mw_canonical": 950,
      "aeso_total_dts_mw": 950,
      "aeso_allocations": [
        {
          "proj_no": "P3102",
          "name": "Goldfinch Technology Park MPC Load",
          "mw_type": "Data Load",
          "fuel_type": "No Supply",
          "mw_dts": 950,
          "mw_sts": 0,
          "mw": 950,
          "in_service_date": null,
          "status": "ISD Under Review",
          "stage": 2
        }
      ],
      "auc_filings": [],
      "news_signals": [],
      "municipal_permits": [],
      "score": {
        "rank": 45,
        "final": 11.22,
        "confidence": "low",
        "proponent_disclosed": false,
        "_paid_tier_note": "Per-component breakdown + math chain available in paid operator console."
      },
      "gen_set": {
        "applicable": true,
        "project_class": "hyperscale_ai",
        "backup_units": 436,
        "backup_mw_total": 1090,
        "backup_value_usd_m": [
          436.0,
          763.0
        ],
        "btm_prime": false,
        "btm_total_mw": null,
        "btm_unit_count": 0,
        "in_service_date": null,
        "procurement_window": null,
        "confidence": "low",
        "_paid_tier_note": "Per-unit equipment class, operator-practice citations, and methodology trail available in paid operator console."
      }
    },
    {
      "id": 2000,
      "source": "AESO_SYNTHETIC",
      "source_id": "P3116",
      "name": "Rocky View Data Center",
      "province": "AB",
      "proponent": "Undisclosed",
      "municipality": "Calgary area",
      "sector": "Industrial",
      "stage": "Pre-construction",
      "mw_mpi": 800.0,
      "estimated_cost_millions": null,
      "schedule": null,
      "registry_url": null,
      "mw_dc_load": 800,
      "mw_btm_gen": null,
      "mw_canonical": 800,
      "aeso_total_dts_mw": 800,
      "aeso_allocations": [
        {
          "proj_no": "P3116",
          "name": "Rocky View Data Center MPC Load",
          "mw_type": "Data Load",
          "fuel_type": "No Supply",
          "mw_dts": 800,
          "mw_sts": 0,
          "mw": 800,
          "in_service_date": null,
          "status": "ISD Under Review",
          "stage": 1
        }
      ],
      "auc_filings": [],
      "news_signals": [],
      "municipal_permits": [],
      "score": {
        "rank": 47,
        "final": 11.07,
        "confidence": "low",
        "proponent_disclosed": false,
        "_paid_tier_note": "Per-component breakdown + math chain available in paid operator console."
      },
      "gen_set": {
        "applicable": true,
        "project_class": "hyperscale_ai",
        "backup_units": 368,
        "backup_mw_total": 920,
        "backup_value_usd_m": [
          368.0,
          644.0
        ],
        "btm_prime": false,
        "btm_total_mw": null,
        "btm_unit_count": 0,
        "in_service_date": null,
        "procurement_window": null,
        "confidence": "low",
        "_paid_tier_note": "Per-unit equipment class, operator-practice citations, and methodology trail available in paid operator console."
      }
    },
    {
      "id": 1996,
      "source": "AESO_SYNTHETIC",
      "source_id": "P3112",
      "name": "North Calgary Three Data Centre",
      "province": "AB",
      "proponent": "Undisclosed",
      "municipality": "Calgary area",
      "sector": "Industrial",
      "stage": "Pre-construction",
      "mw_mpi": 450.0,
      "estimated_cost_millions": null,
      "schedule": null,
      "registry_url": null,
      "mw_dc_load": 450,
      "mw_btm_gen": null,
      "mw_canonical": 450,
      "aeso_total_dts_mw": 450,
      "aeso_allocations": [
        {
          "proj_no": "P3112",
          "name": "North Calgary Three Data Centre MPC Load",
          "mw_type": "Data Load",
          "fuel_type": "No Supply",
          "mw_dts": 450,
          "mw_sts": 0,
          "mw": 450,
          "in_service_date": null,
          "status": "ISD Under Review",
          "stage": 1
        }
      ],
      "auc_filings": [],
      "news_signals": [],
      "municipal_permits": [],
      "score": {
        "rank": 48,
        "final": 10.47,
        "confidence": "low",
        "proponent_disclosed": false,
        "_paid_tier_note": "Per-component breakdown + math chain available in paid operator console."
      },
      "gen_set": {
        "applicable": true,
        "project_class": "hyperscale_ai",
        "backup_units": 206,
        "backup_mw_total": 515,
        "backup_value_usd_m": [
          206.0,
          360.5
        ],
        "btm_prime": false,
        "btm_total_mw": null,
        "btm_unit_count": 0,
        "in_service_date": null,
        "procurement_window": null,
        "confidence": "low",
        "_paid_tier_note": "Per-unit equipment class, operator-practice citations, and methodology trail available in paid operator console."
      }
    },
    {
      "id": 1997,
      "source": "AESO_SYNTHETIC",
      "source_id": "P3106",
      "name": "Alberta South Data Centre",
      "province": "AB",
      "proponent": "Undisclosed",
      "municipality": "Lethbridge area",
      "sector": "Industrial",
      "stage": "Pre-construction",
      "mw_mpi": 400.0,
      "estimated_cost_millions": null,
      "schedule": null,
      "registry_url": null,
      "mw_dc_load": 400,
      "mw_btm_gen": null,
      "mw_canonical": 400,
      "aeso_total_dts_mw": 400,
      "aeso_allocations": [
        {
          "proj_no": "P3106",
          "name": "Alberta South A.I. Load",
          "mw_type": "Data Load",
          "fuel_type": "No Supply",
          "mw_dts": 400,
          "mw_sts": 0,
          "mw": 400,
          "in_service_date": null,
          "status": "ISD Under Review",
          "stage": 1
        }
      ],
      "auc_filings": [],
      "news_signals": [],
      "municipal_permits": [],
      "score": {
        "rank": 48,
        "final": 10.47,
        "confidence": "low",
        "proponent_disclosed": false,
        "_paid_tier_note": "Per-component breakdown + math chain available in paid operator console."
      },
      "gen_set": {
        "applicable": true,
        "project_class": "hyperscale_ai",
        "backup_units": 184,
        "backup_mw_total": 460,
        "backup_value_usd_m": [
          184.0,
          322.0
        ],
        "btm_prime": false,
        "btm_total_mw": null,
        "btm_unit_count": 0,
        "in_service_date": null,
        "procurement_window": null,
        "confidence": "low",
        "_paid_tier_note": "Per-unit equipment class, operator-practice citations, and methodology trail available in paid operator console."
      }
    },
    {
      "id": 1998,
      "source": "AESO_SYNTHETIC",
      "source_id": "P3107",
      "name": "Chestermere Enterprise Data Centre",
      "province": "AB",
      "proponent": "Undisclosed",
      "municipality": "Calgary area",
      "sector": "Industrial",
      "stage": "Pre-construction",
      "mw_mpi": 400.0,
      "estimated_cost_millions": null,
      "schedule": null,
      "registry_url": null,
      "mw_dc_load": 400,
      "mw_btm_gen": null,
      "mw_canonical": 400,
      "aeso_total_dts_mw": 400,
      "aeso_allocations": [
        {
          "proj_no": "P3107",
          "name": "Chestermere Enterprise A.I. Load",
          "mw_type": "Data Load",
          "fuel_type": "No Supply",
          "mw_dts": 400,
          "mw_sts": 0,
          "mw": 400,
          "in_service_date": null,
          "status": "ISD Under Review",
          "stage": 1
        }
      ],
      "auc_filings": [],
      "news_signals": [],
      "municipal_permits": [],
      "score": {
        "rank": 48,
        "final": 10.47,
        "confidence": "low",
        "proponent_disclosed": false,
        "_paid_tier_note": "Per-component breakdown + math chain available in paid operator console."
      },
      "gen_set": {
        "applicable": true,
        "project_class": "hyperscale_ai",
        "backup_units": 184,
        "backup_mw_total": 460,
        "backup_value_usd_m": [
          184.0,
          322.0
        ],
        "btm_prime": false,
        "btm_total_mw": null,
        "btm_unit_count": 0,
        "in_service_date": null,
        "procurement_window": null,
        "confidence": "low",
        "_paid_tier_note": "Per-unit equipment class, operator-practice citations, and methodology trail available in paid operator console."
      }
    },
    {
      "id": 2004,
      "source": "AESO_SYNTHETIC",
      "source_id": "P3136",
      "name": "Sundance Data Centre",
      "province": "AB",
      "proponent": "Undisclosed",
      "municipality": "Wabamun area",
      "sector": "Industrial",
      "stage": "Pre-construction",
      "mw_mpi": 401.0,
      "estimated_cost_millions": null,
      "schedule": null,
      "registry_url": null,
      "mw_dc_load": 401,
      "mw_btm_gen": null,
      "mw_canonical": 401,
      "aeso_total_dts_mw": 401,
      "aeso_allocations": [
        {
          "proj_no": "P3136",
          "name": "Sundance Data Load",
          "mw_type": "Data Load",
          "fuel_type": "No Supply",
          "mw_dts": 401,
          "mw_sts": 0,
          "mw": 401,
          "in_service_date": null,
          "status": "ISD Under Review",
          "stage": 1
        }
      ],
      "auc_filings": [],
      "news_signals": [],
      "municipal_permits": [],
      "score": {
        "rank": 48,
        "final": 10.47,
        "confidence": "low",
        "proponent_disclosed": false,
        "_paid_tier_note": "Per-component breakdown + math chain available in paid operator console."
      },
      "gen_set": {
        "applicable": true,
        "project_class": "hyperscale_ai",
        "backup_units": 184,
        "backup_mw_total": 460,
        "backup_value_usd_m": [
          184.0,
          322.0
        ],
        "btm_prime": false,
        "btm_total_mw": null,
        "btm_unit_count": 0,
        "in_service_date": null,
        "procurement_window": null,
        "confidence": "low",
        "_paid_tier_note": "Per-unit equipment class, operator-practice citations, and methodology trail available in paid operator console."
      }
    },
    {
      "id": 2005,
      "source": "AESO_SYNTHETIC",
      "source_id": "P3156",
      "name": "High Plains East BT Data Centre",
      "province": "AB",
      "proponent": "Undisclosed",
      "municipality": "Calgary area",
      "sector": "Industrial",
      "stage": "Pre-construction",
      "mw_mpi": 300.0,
      "estimated_cost_millions": null,
      "schedule": null,
      "registry_url": null,
      "mw_dc_load": 300,
      "mw_btm_gen": null,
      "mw_canonical": 300,
      "aeso_total_dts_mw": 300,
      "aeso_allocations": [
        {
          "proj_no": "P3156",
          "name": "High Plains East BT Data Load",
          "mw_type": "Data Load",
          "fuel_type": "No Supply",
          "mw_dts": 300,
          "mw_sts": 0,
          "mw": 300,
          "in_service_date": null,
          "status": "ISD Under Review",
          "stage": 1
        }
      ],
      "auc_filings": [],
      "news_signals": [],
      "municipal_permits": [],
      "score": {
        "rank": 52,
        "final": 10.32,
        "confidence": "low",
        "proponent_disclosed": false,
        "_paid_tier_note": "Per-component breakdown + math chain available in paid operator console."
      },
      "gen_set": {
        "applicable": true,
        "project_class": "hyperscale_ai",
        "backup_units": 138,
        "backup_mw_total": 345,
        "backup_value_usd_m": [
          138.0,
          241.5
        ],
        "btm_prime": false,
        "btm_total_mw": null,
        "btm_unit_count": 0,
        "in_service_date": null,
        "procurement_window": null,
        "confidence": "low",
        "_paid_tier_note": "Per-unit equipment class, operator-practice citations, and methodology trail available in paid operator console."
      }
    },
    {
      "id": 1990,
      "source": "AESO_SYNTHETIC",
      "source_id": "P3077",
      "name": "Calgary Enterprise Data Centre",
      "province": "AB",
      "proponent": "Undisclosed",
      "municipality": "Calgary area",
      "sector": "Industrial",
      "stage": "Pre-construction",
      "mw_mpi": 200.0,
      "estimated_cost_millions": null,
      "schedule": null,
      "registry_url": null,
      "mw_dc_load": 200,
      "mw_btm_gen": null,
      "mw_canonical": 200,
      "aeso_total_dts_mw": 200,
      "aeso_allocations": [
        {
          "proj_no": "P3077",
          "name": "Calgary Enterprise A.I. Load",
          "mw_type": "Data Load",
          "fuel_type": "No Supply",
          "mw_dts": 200,
          "mw_sts": 0,
          "mw": 200,
          "in_service_date": null,
          "status": "ISD Under Review",
          "stage": 2
        }
      ],
      "auc_filings": [],
      "news_signals": [],
      "municipal_permits": [],
      "score": {
        "rank": 53,
        "final": 10.18,
        "confidence": "low",
        "proponent_disclosed": false,
        "_paid_tier_note": "Per-component breakdown + math chain available in paid operator console."
      },
      "gen_set": {
        "applicable": true,
        "project_class": "hyperscale_ai",
        "backup_units": 92,
        "backup_mw_total": 230,
        "backup_value_usd_m": [
          92.0,
          161.0
        ],
        "btm_prime": false,
        "btm_total_mw": null,
        "btm_unit_count": 0,
        "in_service_date": null,
        "procurement_window": null,
        "confidence": "low",
        "_paid_tier_note": "Per-unit equipment class, operator-practice citations, and methodology trail available in paid operator console."
      }
    },
    {
      "id": 1991,
      "source": "AESO_SYNTHETIC",
      "source_id": "P3078",
      "name": "Calgary A.I. Data Centre",
      "province": "AB",
      "proponent": "Undisclosed",
      "municipality": "Calgary area",
      "sector": "Industrial",
      "stage": "Pre-construction",
      "mw_mpi": 150.0,
      "estimated_cost_millions": null,
      "schedule": null,
      "registry_url": null,
      "mw_dc_load": 150,
      "mw_btm_gen": null,
      "mw_canonical": 150,
      "aeso_total_dts_mw": 150,
      "aeso_allocations": [
        {
          "proj_no": "P3078",
          "name": "Calgary A.I. Centre Load",
          "mw_type": "Data Load",
          "fuel_type": "No Supply",
          "mw_dts": 150,
          "mw_sts": 0,
          "mw": 150,
          "in_service_date": null,
          "status": "ISD Under Review",
          "stage": 2
        }
      ],
      "auc_filings": [],
      "news_signals": [],
      "municipal_permits": [],
      "score": {
        "rank": 54,
        "final": 10.02,
        "confidence": "low",
        "proponent_disclosed": false,
        "_paid_tier_note": "Per-component breakdown + math chain available in paid operator console."
      },
      "gen_set": {
        "applicable": true,
        "project_class": "hyperscale_ai",
        "backup_units": 69,
        "backup_mw_total": 172,
        "backup_value_usd_m": [
          68.8,
          120.4
        ],
        "btm_prime": false,
        "btm_total_mw": null,
        "btm_unit_count": 0,
        "in_service_date": null,
        "procurement_window": null,
        "confidence": "low",
        "_paid_tier_note": "Per-unit equipment class, operator-practice citations, and methodology trail available in paid operator console."
      }
    },
    {
      "id": 1999,
      "source": "AESO_SYNTHETIC",
      "source_id": "P3114",
      "name": "Banshee Data Centre",
      "province": "AB",
      "proponent": "Undisclosed",
      "municipality": "Hinton / Edson area",
      "sector": "Industrial",
      "stage": "Pre-construction",
      "mw_mpi": 94.0,
      "estimated_cost_millions": null,
      "schedule": null,
      "registry_url": null,
      "mw_dc_load": 94,
      "mw_btm_gen": null,
      "mw_canonical": 94,
      "aeso_total_dts_mw": 94,
      "aeso_allocations": [
        {
          "proj_no": "P3114",
          "name": "Banshee Data Load",
          "mw_type": "Data Load",
          "fuel_type": "No Supply",
          "mw_dts": 94,
          "mw_sts": 0,
          "mw": 94,
          "in_service_date": null,
          "status": "ISD Under Review",
          "stage": 2
        }
      ],
      "auc_filings": [],
      "news_signals": [],
      "municipal_permits": [],
      "score": {
        "rank": 55,
        "final": 9.88,
        "confidence": "low",
        "proponent_disclosed": false,
        "_paid_tier_note": "Per-component breakdown + math chain available in paid operator console."
      },
      "gen_set": {
        "applicable": true,
        "project_class": "hyperscale_ai",
        "backup_units": 43,
        "backup_mw_total": 108,
        "backup_value_usd_m": [
          43.2,
          75.6
        ],
        "btm_prime": false,
        "btm_total_mw": null,
        "btm_unit_count": 0,
        "in_service_date": null,
        "procurement_window": null,
        "confidence": "low",
        "_paid_tier_note": "Per-unit equipment class, operator-practice citations, and methodology trail available in paid operator console."
      }
    }
  ],
  "featured": {
    "id": 1192,
    "source": "AB_MPI",
    "source_id": "10983",
    "name": "Greenlight Electricity Centre",
    "province": "AB",
    "proponent": "Pembina Pipeline and Kineticor JV",
    "municipality": "Sturgeon County",
    "sector": "Power",
    "stage": "Proposed",
    "mw_mpi": 1864.0,
    "estimated_cost_millions": 4500.0,
    "schedule": "Completion by 2029",
    "registry_url": "https://kineticor.ca/operation/greenlight-electricity-centre/",
    "mw_dc_load": 1800,
    "mw_btm_gen": 1398,
    "mw_canonical": 1800,
    "aeso_total_dts_mw": 1800,
    "aeso_allocations": [
      {
        "proj_no": "P2936",
        "name": "GLDC Load Phase 1.1",
        "mw_type": "Data Load",
        "fuel_type": "No Supply",
        "mw_dts": 970,
        "mw_sts": 0,
        "mw": 970,
        "in_service_date": "2027-05-01",
        "status": "Active",
        "stage": 2,
        "link_method": "projno_alias"
      },
      {
        "proj_no": "P3151",
        "name": "GLDC Load Phase 1.2",
        "mw_type": "Data Load",
        "fuel_type": "No Supply",
        "mw_dts": 830,
        "mw_sts": 0,
        "mw": 830,
        "in_service_date": null,
        "status": "ISD Under Review",
        "stage": 2,
        "link_method": "projno_alias"
      },
      {
        "proj_no": "P2533",
        "name": "Greenlight Gas",
        "mw_type": "Gas",
        "fuel_type": "Gas",
        "mw_dts": 20,
        "mw_sts": 466,
        "mw": 20,
        "in_service_date": "2028-06-01",
        "status": "Active",
        "stage": 3,
        "link_method": "token_overlap"
      },
      {
        "proj_no": "P2796",
        "name": "Greenlight U2 Gas",
        "mw_type": "Gas",
        "fuel_type": "Gas",
        "mw_dts": 20,
        "mw_sts": 466,
        "mw": 20,
        "in_service_date": "2028-06-01",
        "status": "Active",
        "stage": 3,
        "link_method": "token_overlap"
      },
      {
        "proj_no": "P2797",
        "name": "Greenlight U3 Gas",
        "mw_type": "Gas",
        "fuel_type": "Gas",
        "mw_dts": 20,
        "mw_sts": 466,
        "mw": 20,
        "in_service_date": "2028-06-01",
        "status": "Active",
        "stage": 3,
        "link_method": "token_overlap"
      }
    ],
    "auc_filings": [
      {
        "application": "30261-A001",
        "applicant": "Greenlight Electricity Centre",
        "description": "Application for the construction of an 1864MW combined cycle powerplant.",
        "date": "2025-08-28",
        "url": "https://efiling-webapi.auc.ab.ca/Proceeding/Search?proceeding=30261",
        "link_method": "applicant_match"
      }
    ],
    "news_signals": [],
    "municipal_permits": [],
    "score": {
      "rank": 8,
      "final": 79.85,
      "raw_weighted": 79.85,
      "confidence": "high",
      "confidence_cap": 100,
      "proponent_disclosed": true,
      "components": {
        "power_secured": {
          "score": 87,
          "weight_pct": 30,
          "why": "4 active AESO / AESO GENERATION allocation(s); max 970 MW DTS, AESO stage 3"
        },
        "land_control": {
          "score": 70,
          "weight_pct": 15,
          "why": "site identified (Sturgeon County), stage=proposed"
        },
        "zoning": {
          "score": 70,
          "weight_pct": 10,
          "why": "filed under power/natural gas — utility-industrial zone typical"
        },
        "permitting": {
          "score": 60,
          "weight_pct": 10,
          "why": "1 AUC filing(s)"
        },
        "capital_commitment": {
          "score": 100,
          "weight_pct": 15,
          "why": "$4,500M committed in MPI — major capex"
        },
        "proponent_track": {
          "score": 70,
          "weight_pct": 15,
          "why": "matched operator 'pembina' (tier 70)"
        },
        "timeline_credibility": {
          "score": 95,
          "weight_pct": 5,
          "why": "AESO ISD 2027-05-01 (~12 months out)"
        },
        "raw_weighted": 79.85,
        "disclosed_multiplier": 1.0,
        "after_disclosed_mult": 79.85,
        "confidence": "high",
        "confidence_why": "MPI entry + active power allocation",
        "confidence_cap": 100,
        "final": 79.85,
        "linked_allocations": [
          "P3151",
          "P2936",
          "P2533",
          "P2796",
          "P2797"
        ],
        "linked_filings": 1,
        "linked_news": 0
      }
    },
    "gen_set": {
      "applicable": true,
      "project_class": "hyperscale_ai",
      "project_class_reason": "pembina",
      "operator_practice": {
        "match": "pembina",
        "project_type": "hyperscale_ai",
        "summary": "Pembina/Kineticor JV (Greenlight) uses utility-scale combined-cycle gas turbines. Heavy-frame, EPC-direct from GE/Siemens/Mitsubishi — not packager territory.",
        "implied_class": "Heavy frame CCGT (GE 7HA / SGT-8000H / M501JAC class)",
        "implied_packager_relevant": false,
        "btm_implied": true,
        "source": "AESO Generation queue rows P2533, P2796, P2797 (Greenlight Gas units, 466 MW STS each)."
      },
      "backup_units": 827,
      "backup_mw_total": 2068,
      "backup_class": "Diesel/dual-fuel packaged gen-sets (2.5 MW class — Cat 3516E, MTU 4000, Cummins QSK)",
      "backup_value_usd_m": [
        827.2,
        1447.6
      ],
      "backup_profile": {
        "redundancy_factor": 1.0,
        "package_mw": 2.5,
        "rationale": "Tier 3/4 hyperscale: ~100% of IT load in 2.5 MW packages, N+1."
      },
      "btm_prime": true,
      "btm_total_mw": 1398,
      "btm_unit_count": 3,
      "btm_units": [
        {
          "proj_no": "P2533",
          "name": "Greenlight Gas",
          "mw": 466,
          "mw_type": "Gas",
          "fuel_type": "Gas",
          "isd": "2028-06-01",
          "status": "Active",
          "class": "Heavy frame turbines (GE 7HA, SGT-8000H, M501JAC class) — typically EPC-direct",
          "packager": false,
          "value_usd_m": [
            279.6,
            466.0
          ],
          "is_cancelled": false
        },
        {
          "proj_no": "P2796",
          "name": "Greenlight U2 Gas",
          "mw": 466,
          "mw_type": "Gas",
          "fuel_type": "Gas",
          "isd": "2028-06-01",
          "status": "Active",
          "class": "Heavy frame turbines (GE 7HA, SGT-8000H, M501JAC class) — typically EPC-direct",
          "packager": false,
          "value_usd_m": [
            279.6,
            466.0
          ],
          "is_cancelled": false
        },
        {
          "proj_no": "P2797",
          "name": "Greenlight U3 Gas",
          "mw": 466,
          "mw_type": "Gas",
          "fuel_type": "Gas",
          "isd": "2028-06-01",
          "status": "Active",
          "class": "Heavy frame turbines (GE 7HA, SGT-8000H, M501JAC class) — typically EPC-direct",
          "packager": false,
          "value_usd_m": [
            279.6,
            466.0
          ],
          "is_cancelled": false
        }
      ],
      "btm_classes_present": [
        "Heavy frame turbines (GE 7HA, SGT-8000H, M501JAC class) — typically EPC-direct"
      ],
      "btm_packager_target": false,
      "btm_signal_source": "aeso_thermal_gen_linked",
      "btm_value_usd_m": [
        838.8,
        1398.0
      ],
      "btm_mw": 466,
      "btm_fuel": "Gas",
      "btm_class": "Heavy frame turbines (GE 7HA, SGT-8000H, M501JAC class) — typically EPC-direct",
      "inferred_prime": null,
      "fuel_hint_from_load": null,
      "auc_btm_keyword": null,
      "auc_tech_keyword": "combined cycle",
      "news_btm_keyword": null,
      "news_tech_keyword": null,
      "in_service_date": "2027-05-01",
      "procurement_window": [
        "2025-05",
        "2025-11"
      ],
      "confidence": "high",
      "methodology": [
        {
          "step": "Project classification",
          "finding": "hyperscale_ai",
          "source": "pembina"
        },
        {
          "step": "Operator-practice lookup",
          "finding": "Pembina/Kineticor JV (Greenlight) uses utility-scale combined-cycle gas turbines. Heavy-frame, EPC-direct from GE/Siemens/Mitsubishi — not packager territory.",
          "source": "AESO Generation queue rows P2533, P2796, P2797 (Greenlight Gas units, 466 MW STS each)."
        },
        {
          "step": "Backup-gen sizing (hyperscale_ai)",
          "finding": "827 units × 2.5 MW = 2068 MW total",
          "source": "Tier 3/4 hyperscale: ~100% of IT load in 2.5 MW packages, N+1."
        },
        {
          "step": "BTM prime — confirmed",
          "finding": "3 thermal generation row(s) linked in AESO Generation queue, totaling 1398 MW STS",
          "source": "AESO Long-term Adequacy report — power_allocations rows: P2533, P2796, P2797"
        }
      ]
    }
  },
  "gen_set_summary": {
    "backup_units": 8725,
    "backup_mw": 21710,
    "backup_value_usd_m_low": 8702.9,
    "backup_value_usd_m_high": 15215.3,
    "btm_projects": 5,
    "btm_total_mw": 3708,
    "btm_packager_mw": 847,
    "btm_epc_direct_mw": 2861,
    "btm_packager_value_usd_m_low": 594.4,
    "btm_packager_value_usd_m_high": 1020.9,
    "btm_epc_value_usd_m_low": 1716.6,
    "btm_epc_value_usd_m_high": 2861.0,
    "inferred_prime_projects": 0,
    "inferred_prime_units": 0,
    "inferred_prime_mw": 0,
    "project_class_counts": {
      "telecom_hyperscale": 3,
      "colocation": 1,
      "hyperscale_ai": 31,
      "mining": 5,
      "stranded_gas_compute": 1,
      "unknown": 1,
      "edge_micro": 1
    }
  },
  "source_freshness": {
    "AB_GOV": "2026-05-06T02:14:20Z",
    "AB_MPI": "2026-05-06T02:12:48Z",
    "AESO_GENERATION": "2026-05-09T21:12:11Z",
    "AESO_LARGE_LOAD": "2026-05-09T21:12:11Z",
    "AUC_CURRENT": "2026-05-09T21:12:30Z",
    "BC_GOV": "2026-05-06T02:12:51Z",
    "BC_MPI": "2026-05-06T02:12:49Z",
    "IND_BIV": "2026-05-09T21:40:23Z",
    "IND_CALGARY_HERALD": "2026-05-09T21:37:17Z",
    "IND_CBC_BC": "2026-05-09T21:40:24Z",
    "IND_CBC_CALGARY": "2026-05-09T21:37:18Z",
    "IND_CBC_EDMONTON": "2026-05-09T21:37:18Z",
    "IND_CBC_SASK": "2026-05-09T21:40:24Z",
    "IND_CTV_EDMONTON": "2026-05-09T21:40:26Z",
    "IND_DCD": "2026-05-09T21:37:52Z",
    "IND_DCK": "2026-05-09T21:40:22Z",
    "IND_EDMONTON_JOURNAL": "2026-05-09T21:37:17Z",
    "IND_GLOBENEWSWIRE": "2026-05-09T21:37:18Z",
    "IND_GLOBE_MAIL_BIZ": "2026-05-09T21:37:14Z",
    "IND_REGISTER_DC": "2026-05-09T21:40:22Z",
    "MUNI_CYPRESS": "2026-05-09T22:10:15Z",
    "MUNI_FOOTHILLS": "2026-05-07T02:55:37Z",
    "MUNI_ROCKY_VIEW": "2026-05-07T02:54:02Z",
    "MUNI_STRATHCONA": "2026-05-10T13:50:27Z",
    "MUNI_STURGEON": "2026-05-07T00:03:21Z",
    "SEED": "2026-05-09T22:12:18Z",
    "SEED_POWER": "2026-05-06T02:50:28Z",
    "SK_GOV": "2026-05-06T02:12:51Z"
  },
  "_public_samples": [
    "Crusoe AI Data Centres Alberta",
    "Greenlight Electricity Centre"
  ],
  "_paid_tier_note": "Per-component score breakdowns + per-unit gen-set detail + operator-practice library + linker methodology + data-quality audit are available in the operator console (paid). Two sample projects shown in full as a credibility check: see _public_samples list."
}