BLACKSTART · AB · Rank #16 of 27

Crusoe AI Data Centres Alberta

AB Proposed MEDIUM CONFIDENCE 6 POWER ALLOCATIONS
Crusoe AI · Brazeau County|Red Deer County|Rocky View County · Industrial
52
BUILDREADINESS / 100

Key signals

840 MW
Power contracted
$3.0B
Capex disclosed
6
Power allocations
0
AUC filings
0
News signals
Data discrepancy notes — surfaced for transparency
  • Power gap: linked BTM gas generation (534 MW) covers only 63% of DC load (840 MW) — the project is likely supplementing with grid power or has additional BTM gen units not yet filed.

Score breakdown · 7 components

Power Secured
30% weight
37
6 AESO / AESO GENERATION allocation(s) under review at AESO stage 2; max 280 MW DTS
Evidence
6 AESO rowsP3153P3154P3155P2979P2980
Land Control
15% weight
50
multiple municipalities listed (Brazeau County|Red Deer County|Rocky View County)
Evidence
MPI · 11556muni: Brazeau County|Red Deer County
Zoning
10% weight
70
filed under industrial sector — zoning likely in place
Evidence
sector: Industrial
Permitting
10% weight
0
announced only — no filings
Evidence
no filings or permits linked
Capital Commitment
15% weight
100
$3,000M committed in MPI — major capex
Evidence
MPI capex: $3,000.0M
Proponent Track Record
15% weight
70
matched operator 'crusoe' (tier 70)
Evidence
proponent: Crusoe AI
Timeline Credibility
5% weight
20
no firm timeline
Evidence
no firm timeline
Raw weighted
52.1
Disclosed mult.
×1.00
Confidence cap
80
Final score
52

Power equipment opportunities HIGH CONFIDENCE Stranded-Gas Compute

Inferred gen-set demand for this project. Headline rollup is shown publicly; the per-unit equipment class, operator-practice library citations, and the full methodology trail are in the operator console.

Backup gen-sets — n/a
No separate backup tier expected
The distributed reciprocating fleet IS the prime power. Sites of this class don't add a separate packaged-diesel backup tier.
Procurement window
Typically 18–24 months before in-service
Based on AESO in-service date . RFQs typically issue inside this window.
Operator practice (curated)
Match: "crusoe"
Crusoe Energy Systems pioneered stranded-gas-to-compute. Each Crusoe energy park typically runs distributed Caterpillar G3500-series natural-gas reciprocating engines (1-3 MW per unit) behind the meter. The reciprocating fleet IS the prime power source.
Source: Crusoe Energy Systems public marketing materials; AER methane-reduction filings; Cat dealer announcements (Toromont/Finning).
Behind-the-meter prime generation — confirmed
3 units from AESO Generation queue · linked to this project
534 MW total
Packager-relevant — at least one unit falls in the reciprocating or aero-derivative class.
Proj #AESO NameMW (STS)TypeFuelIn-ServiceBucketEst. valueEquipment class
P2979 Alsike Energy Park MPC Gas UNDER REVIEW 178 MW Gas Gas PACKAGER $125M – $214M Aero-derivative turbines (LM6000, SGT-A class) — semi-packageable
P2980 Lone Pine Energy Park MPC Gas UNDER REVIEW 178 MW Gas Gas PACKAGER $125M – $214M Aero-derivative turbines (LM6000, SGT-A class) — semi-packageable
P2981 Myers Energy Park MPC Gas UNDER REVIEW 178 MW Gas Gas PACKAGER $125M – $214M Aero-derivative turbines (LM6000, SGT-A class) — semi-packageable
Total estimated package value: $374M – $641M

Per-class value bands: Heavy frame $600–$1000/kW; Aero-derivative $700–$1200/kW; Reciprocating $800–$1500/kW. Cancelled rows shown for transparency but excluded from totals. Value is for the gen package only (turbine/engine + switchgear + controls); does not include site civils, fuel infrastructure, or grid interconnect.

▸ Methodology — every input used, with sources
Step Finding Source
Project classification stranded_gas_compute crusoe
Operator-practice lookup Crusoe Energy Systems pioneered stranded-gas-to-compute. Each Crusoe energy park typically runs distributed Caterpillar G3500-series natural-gas reciprocating engines (1-3 MW per unit) behind the meter. The reciprocating fleet IS the prime power source. Crusoe Energy Systems public marketing materials; AER methane-reduction filings; Cat dealer announcements (Toromont/Finning).
Backup-gen sizing (stranded_gas_compute) 0 units × 0.0 MW = 0 MW total Distributed reciprocating engines ARE the prime power source — no separate backup tier (operator-practice based).
BTM prime — confirmed 3 thermal generation row(s) linked in AESO Generation queue, totaling 534 MW STS AESO Long-term Adequacy report — power_allocations rows: P2979, P2980, P2981

Power allocations Source: AESO Long-term Adequacy report

Proj NoAllocationTypeMWStageStatusIn-ServiceLink via
P3153 Alsike Energy Park MPC Data Load Data Load 280 MW Stage 2 ISD Under Review projno_alias
P3154 Lone Pine Energy Park MPC Data Load Data Load 280 MW Stage 2 ISD Under Review projno_alias
P3155 Myers Energy Park MPC Data Load Data Load 280 MW Stage 2 ISD Under Review projno_alias
P2979 Alsike Energy Park MPC Gas Gas 178 MW Stage 2 ISD Under Review projno_alias
P2980 Lone Pine Energy Park MPC Gas Gas 178 MW Stage 2 ISD Under Review projno_alias
P2981 Myers Energy Park MPC Gas Gas 178 MW Stage 2 ISD Under Review projno_alias

AUC regulatory filings Source: AUC Current Applications

No AUC filings linked.

Municipal permits Source: County development-permit notices

No municipal permits linked.

News signals Source: gov + industry RSS feeds + Claude extraction

No news signals linked.

Source registry

MPI registry source →
Schedule: —

Source freshness When was each underlying source last refreshed

Each fact on this page is only as fresh as its source scrape. Green = refreshed in the last 24 hours. Amber = 24-48 hours. Yellow/red = 2+ days. If you're making a procurement decision off something here, the freshness column tells you whether to verify with the underlying agency before acting.

AB MPI registry5d ago
AESO Generation Queue41h ago
AESO Large Load Projects41h ago