BLACKSTART · AB · Rank #8 of 27

Greenlight Electricity Centre

AB Proposed HIGH CONFIDENCE 5 POWER ALLOCATIONS 1 AUC FILING
Pembina Pipeline and Kineticor JV · Sturgeon County · Power
80
BUILDREADINESS / 100

Key signals

1800 MW
Power contracted
$4.5B
Capex disclosed
5
Power allocations
1
AUC filings
0
News signals

Score breakdown · 7 components

Power Secured
30% weight
87
4 active AESO / AESO GENERATION allocation(s); max 970 MW DTS, AESO stage 3
Evidence
5 AESO rowsP2936P3151P2533P2796P2797
Land Control
15% weight
70
site identified (Sturgeon County), stage=proposed
Evidence
MPI · 10983muni: Sturgeon County
Zoning
10% weight
70
filed under power/natural gas — utility-industrial zone typical
Evidence
sector: Power
Permitting
10% weight
60
1 AUC filing(s)
Evidence
1 AUC filing30261-A001
Capital Commitment
15% weight
100
$4,500M committed in MPI — major capex
Evidence
MPI capex: $4,500.0M
Proponent Track Record
15% weight
70
matched operator 'pembina' (tier 70)
Evidence
proponent: Pembina Pipeline and Kineticor JV
Timeline Credibility
5% weight
95
AESO ISD 2027-05-01 (~12 months out)
Evidence
AESO ISD: 2027-05-01
Raw weighted
79.85
Disclosed mult.
×1.00
Confidence cap
100
Final score
80

Power equipment opportunities HIGH CONFIDENCE Hyperscale AI

Inferred gen-set demand for this project. Headline rollup is shown publicly; the per-unit equipment class, operator-practice library citations, and the full methodology trail are in the operator console.

Backup gen-sets (estimated)
Diesel/dual-fuel packaged gen-sets (2.5 MW class — Cat 3516E, MTU 4000, Cummins QSK)
827
Roughly 2068 MW of packaged backup capacity across 827 units. Estimated package value: $827M – $1448M at $400–$700/kW installed.
Sizing rationale: Tier 3/4 hyperscale: ~100% of IT load in 2.5 MW packages, N+1.
Procurement window
Typically 18–24 months before in-service
2025-05 → 2025-11
Based on AESO in-service date 2027-05-01. RFQs typically issue inside this window.
Operator practice (curated)
Match: "pembina"
Pembina/Kineticor JV (Greenlight) uses utility-scale combined-cycle gas turbines. Heavy-frame, EPC-direct from GE/Siemens/Mitsubishi — not packager territory.
Source: AESO Generation queue rows P2533, P2796, P2797 (Greenlight Gas units, 466 MW STS each).
Behind-the-meter prime generation — confirmed
3 units from AESO Generation queue · linked to this project
1398 MW total
All units are heavy-frame class — typically EPC-direct (GE / Siemens / Mitsubishi). Not gen-set packager territory.
Proj #AESO NameMW (STS)TypeFuelIn-ServiceBucketEst. valueEquipment class
P2533 Greenlight Gas 466 MW Gas Gas 2028-06-01 EPC-DIRECT $280M – $466M Heavy frame turbines (GE 7HA, SGT-8000H, M501JAC class) — typically EPC-direct
P2796 Greenlight U2 Gas 466 MW Gas Gas 2028-06-01 EPC-DIRECT $280M – $466M Heavy frame turbines (GE 7HA, SGT-8000H, M501JAC class) — typically EPC-direct
P2797 Greenlight U3 Gas 466 MW Gas Gas 2028-06-01 EPC-DIRECT $280M – $466M Heavy frame turbines (GE 7HA, SGT-8000H, M501JAC class) — typically EPC-direct
Total estimated package value: $839M – $1398M

Per-class value bands: Heavy frame $600–$1000/kW; Aero-derivative $700–$1200/kW; Reciprocating $800–$1500/kW. Cancelled rows shown for transparency but excluded from totals. Value is for the gen package only (turbine/engine + switchgear + controls); does not include site civils, fuel infrastructure, or grid interconnect.

▸ Methodology — every input used, with sources
Step Finding Source
Project classification hyperscale_ai pembina
Operator-practice lookup Pembina/Kineticor JV (Greenlight) uses utility-scale combined-cycle gas turbines. Heavy-frame, EPC-direct from GE/Siemens/Mitsubishi — not packager territory. AESO Generation queue rows P2533, P2796, P2797 (Greenlight Gas units, 466 MW STS each).
Backup-gen sizing (hyperscale_ai) 827 units × 2.5 MW = 2068 MW total Tier 3/4 hyperscale: ~100% of IT load in 2.5 MW packages, N+1.
BTM prime — confirmed 3 thermal generation row(s) linked in AESO Generation queue, totaling 1398 MW STS AESO Long-term Adequacy report — power_allocations rows: P2533, P2796, P2797

Power allocations Source: AESO Long-term Adequacy report

Proj NoAllocationTypeMWStageStatusIn-ServiceLink via
P2936 GLDC Load Phase 1.1 Data Load 970 MW Stage 2 Active 2027-05-01 projno_alias
P3151 GLDC Load Phase 1.2 Data Load 830 MW Stage 2 ISD Under Review projno_alias
P2533 Greenlight Gas Gas 466 MW Stage 3 Active 2028-06-01 token_overlap
P2796 Greenlight U2 Gas Gas 466 MW Stage 3 Active 2028-06-01 token_overlap
P2797 Greenlight U3 Gas Gas 466 MW Stage 3 Active 2028-06-01 token_overlap

AUC regulatory filings Source: AUC Current Applications

Municipal permits Source: County development-permit notices

No municipal permits linked.

News signals Source: gov + industry RSS feeds + Claude extraction

No news signals linked.

Source registry

MPI registry source →
Schedule: Completion by 2029

Source freshness When was each underlying source last refreshed

Each fact on this page is only as fresh as its source scrape. Green = refreshed in the last 24 hours. Amber = 24-48 hours. Yellow/red = 2+ days. If you're making a procurement decision off something here, the freshness column tells you whether to verify with the underlying agency before acting.

AB MPI registry5d ago
AESO Generation Queue41h ago
AESO Large Load Projects41h ago
AUC Current Applications41h ago